You must log in to edit PetroWiki. Help with editing

Content of PetroWiki is intended for personal use only and to supplement, not replace, engineering judgment. SPE disclaims any and all liability for your use of such content. More information

Message: PetroWiki content is moving to OnePetro! Please note that all projects need to be complete by November 1, 2024, to ensure a smooth transition. Online editing will be turned off on this date.


Production forecasting flowchart

PetroWiki
Jump to navigation Jump to search

A good forecast combines all six production forcasting building blocks in a numerical model. Two examples of flowcharts for deriving a production forecast are given in Fig 1 and Fig 2 Individual steps may be adjusted to local needs, but the overall workflow should always follow a similar pattern and adhere to the production forecasting minimal expectations.

INSERT Figure 1 Typical production forecasting flowchart (Pending permission approval)

Typical production forecasting flowchart steps

INSERT Figure 2 Typical production forecasting flowchart (Pending permission approval)


Fig 2 flowchart assumes that the forecast is made for a mature field with an IPSM (integrated production system model, but similar steps should to be considered for analog methods and DCA. If this is a green field model, similar steps should be carried out to calibrate the model with known analog performance.

Agree on objectives and forecasting strategy

Always start by agreeing on the objectives of the forecast and by deriving a forecasting strategy based on these objectives.

Gather data

Once the objectives are clear, the appropriate input data must be gathered. 

Calibrate the model

These steps of history matching and model calibration can be carried out in parallel and potentially by different discipline engineers. In this step, the model is conditioned for forecasting.

Match reservoir performance

Match long-term trends, such as pressure decline and water cut development, as well as 4D seismic.

Match well potential and surface constraints

Calibration of pressure drops in the wells, pipes and surface facilities.

Activity plans and up times

Planned and statistical activities with historical system availability (e,g., downtime).

Make the long-term forecast

Once the model is properly calibrated, the long-term forecast may be made by running the model to the agreed abandonment conditions.

Include operational forecast planning assumptions

After the long-term forecast has been derived and the reservoir decline is established, near-term activities should be included in the forecast.

Update Risk Register

Any uncertainty analysis should start with a risk register, which is kept evergreen for the field. 

Develop uncertainty analysis low/best/high estimate

Uncertainty analysis is a key deliverable of any forecast.

Review and challenge

Forecasts should in general be peer reviewed by experienced peers or supervisors to get an independent view of the forecast quality. This may result in a feedback loop back to Step 4, to make the long-term forecast again with different assumptions as agreed during the review.

Apply adjustment factors

Even with the best geological model and tools, it may still be decided that the full reservoir heterogeneity is not captured in the model and further adjustments need to be applied to the forecast. Or actual project execution may be uncertain. In this case, a discount factor should be applied to the forecast.

References


Noteworthy papers in OnePetro

Noteworthy books

Society of Petroleum Engineers (U.S.). 2011. Production forecasting. Richardson, Tex: Society of Petroleum Engineers. WorldCat or SPE Bookstore

External links

Production forecasts and reserves estimates in unconventional resources. Society of Petroleum Engineers. http://www.spe.org/training/courses/FPE.php

Production Forecasts and Reserves Estimates in Unconventional Resources. Society of Petroleum Engineers. http://www.spe.org/training/courses/FPE1.php

See also

Production forecasting glossary

Aggregation of forecasts

Challenging the current barriers to forecast improvement

Commercial and economic assumptions in production forecasting

Controllable verses non controllable forecast factors

Discounting and risking in production forecasting

Documentation and reporting in production forecasting

Empirical methods in production forecasting

Establishing input for production forecasting

Integrated asset modelling in production forecasting

Long term verses short term production forecast

Look backs and forecast verification

Material balance models in production forecasting

Probabilistic verses deterministic in production forecasting

Production forecasting activity scheduling

Production forecasting analog methods

Production forecasting building blocks

Production forecasting decline curve analysis

Production forecasting expectations

Production forecasting flowchart

Production forecasting frequently asked questions and examples

Production forecasting in the financial markets

Production forecasting principles and definition

Production forecasting purpose

Production forecasting system constraints

Quality assurance in forecast

Reservoir simulation models in production forecasting

Types of decline analysis in production forecasting

Uncertainty analysis in creating production forecast

Uncertainty range in production forecasting

Using multiple methodologies in production forecasting

Category