You must log in to edit PetroWiki. Help with editing
Content of PetroWiki is intended for personal use only and to supplement, not replace, engineering judgment. SPE disclaims any and all liability for your use of such content. More information
Message: PetroWiki content is moving to OnePetro! Please note that all projects need to be complete by November 1, 2024, to ensure a smooth transition. Online editing will be turned off on this date.
Glossary:Top kill
A dynamic kill procedure, used in low pressure wells, good for a short period of time. A typical top kill is to pump 5 bbl of fluid in the tubing, offsetting the tubing pressure as the fluid falls. The well must be monitored for pressure or flow and the pump truck usually stays connected in the event that another fluid pill is necessary.