You must log in to edit PetroWiki. Help with editing
Content of PetroWiki is intended for personal use only and to supplement, not replace, engineering judgment. SPE disclaims any and all liability for your use of such content. More information
Message: PetroWiki content is moving to OnePetro! Please note that all projects need to be complete by November 1, 2024, to ensure a smooth transition. Online editing will be turned off on this date.
Glossary:Maximum efficient rate
Jump to navigation
Jump to search
The maximum rate that a field can be produced or drawn down in pressure without undue stranding of oil that could be lost during more rapid production. Setting the MER required knowledge of fluid and rock properties and well design throughout the formation.