You must log in to edit PetroWiki. Help with editing

Content of PetroWiki is intended for personal use only and to supplement, not replace, engineering judgment. SPE disclaims any and all liability for your use of such content. More information


Glossary:Hook up

PetroWiki
Jump to navigation Jump to search
  • Hook-up refers to a phase in the final construction activities of oil and gas production and processing facilities, whether upstream, downstream or midstream.
  • It means to make a connection between components in a system.
  • Hook-up is the description of tasks that comprise the final connection together of components (such as pre-fabricated equipment skids and modules amongst others) that will when complete comprise the entire production and processing facilities.
  • Hook-up can also be used to describe the tasks required to connect the wellhead Christmas trees to the well flowlines.
  • Hook-up includes structural, process, mechanical, piping, electrical and instrumented control systems.
  • Hook-up can be undertaken once the system components are positioned and installed during construction. As such Hook-up tasks can be undertaken in the fabrication yard (for an offshore facility) or at site.

Category