You must log in to edit PetroWiki. Help with editing
Content of PetroWiki is intended for personal use only and to supplement, not replace, engineering judgment. SPE disclaims any and all liability for your use of such content. More information
Message: PetroWiki content is moving to OnePetro! Please note that all projects need to be complete by November 1, 2024, to ensure a smooth transition. Online editing will be turned off on this date.
Glossary:Cement bond log
A sonic log that determines the top of the cement column and estimates the quality of the cement bond between the casing and the formation. Works on transmission of a sound wave and identifies areas that conduct the wave and those that do not (free pipe ringing). Communication is likely if CBL>10% of unbonded mv reading. Communication is unlikely is CBL <5% of unbonded mv reading and bond length >10 ft (3 m).