You must log in to edit PetroWiki. Help with editing
Content of PetroWiki is intended for personal use only and to supplement, not replace, engineering judgment. SPE disclaims any and all liability for your use of such content. More information
Message: PetroWiki is moving to OnePetro! Please visit PetroWiki's new home here.
Glossary:Bullheading
Jump to navigation
Jump to search
Forcing fluids in the pipe into the formation at a pressure higher than the pore pressure and sometimes higher than the fracturing breakdown pressure. Used to displace a kick out of the pipe when wellbore and wellhead pressure limits permits.Wells with short open hole sections and zones of high permeability respond better to bullheading than wells with long open hole sections and low permeability zones.