contributors, createpage, createtalk, diff, displaysubtitle, edit, editsandbox, history, member, minoredit, reupload, reupload-own, upload, viewlinktolatest, watch, wysiwyg
129
edits
You must log in to edit PetroWiki. Help with editing
Content of PetroWiki is intended for personal use only and to supplement, not replace, engineering judgment. SPE disclaims any and all liability for your use of such content. More information
mNo edit summary |
mNo edit summary |
||
Line 214: | Line 214: | ||
==Design considerations and selection of a plunger== | ==Design considerations and selection of a plunger== | ||
Desirable features in a plunger include efficient sealing, reliability, durability, and the ability to descend quickly.<ref name="r2"/><ref name="r3"/> Rarely does a plunger exhibit all these characteristics, though. Usually a plunger that excels at one aspect sacrifices others. A wide variety of plungers is available to accommodate differences in well performance and operating conditions. For more information:[[Plunger design considerations and selection|Design considerations and plunger selection]] | Desirable features in a plunger include efficient sealing, reliability, durability, and the ability to descend quickly.<ref name="r2"/><ref name="r3"/> Rarely does a plunger exhibit all these characteristics, though. Usually a plunger that excels at one aspect sacrifices others. A wide variety of plungers is available to accommodate differences in well performance and operating conditions. For more information:[[Plunger design considerations and selection|Design considerations and plunger selection]] | ||
==References== | ==References== |
edits