You must log in to edit PetroWiki. Help with editing

Content of PetroWiki is intended for personal use only and to supplement, not replace, engineering judgment. SPE disclaims any and all liability for your use of such content. More information


Taxonomy: Difference between revisions

Jump to navigation Jump to search
3,071 bytes added ,  31 March 2021
m
Protected "Taxonomy": Taxonomy only changed by staff ([Edit=Allow only administrators] (indefinite) [Move=Allow only administrators] (indefinite)) [cascading]
m (Protected "Taxonomy": Taxonomy only changed by staff ([Edit=Allow only administrators] (indefinite) [Move=Allow only administrators] (indefinite)) [cascading])
(32 intermediate revisions by 2 users not shown)
Line 63: Line 63:
::[http://petrowiki.org/Category:1.6.5_Drilling_time_analysis 1.6.5 Drilling time analysis]
::[http://petrowiki.org/Category:1.6.5_Drilling_time_analysis 1.6.5 Drilling time analysis]


::[http://petrowiki.org/Category:1.6.6_Drilling_automation 1.6.6 Drilling automation]
::[http://petrowiki.org/Category:1.6.6_Directional_drilling 1.6.6 Directional drilling]


::[http://petrowiki.org/Category:1.6.7_Directional_drilling 1.6.7 Directional drilling]
::[http://petrowiki.org/Category:1.6.7_Geosteering__/_reservoir_navigation 1.6.7 Geosteering /reservoir navigation]


::[http://petrowiki.org/Category:1.6.8_Geosteering__or_reservoir_navigation 1.6.8 Geosteering or reservoir navigation]
::[http://petrowiki.org/Category:1.6.8_Through_tubing_rotary_drilling 1.6.8 Through tubing rotary drilling]


::[http://petrowiki.org/Category:1.6.9_Through_tubing_rotary_drilling 1.6.9 Through tubing rotary drilling]
::[http://petrowiki.org/Category:1.6.9_Coring_,_fishing 1.6.9 Coring,fishing]


::[http://petrowiki.org/Category:1.6.10_Coring_and_fishing 1.6.10 Coring and fishing]
::[http://petrowiki.org/Category:1.6.10_Running_and_setting_casing 1.6.10 Running and setting casing]


::[http://petrowiki.org/Category:1.6.11_Running_and_setting_casing 1.6.11 Running and setting casing]
::[http://petrowiki.org/Category:1.6.11_Plugging_and_abandonment 1.6.11 Plugging and abandonment]


::[http://petrowiki.org/Category:1.6.12_Plugging_and_abandonment 1.6.12 Plugging and abandonment]
::[http://petrowiki.org/Category:1.6.12_Coiled_tubing_drilling 1.6.12 Coiled tubing drilling]


'''[[#Top|Back to top]]'''
'''[[#Top|Back to top]]'''
Line 95: Line 95:
:[http://petrowiki.org/Category:1.8_Formation_damage 1.8 Formation damage]
:[http://petrowiki.org/Category:1.8_Formation_damage 1.8 Formation damage]


::[http://petrowiki.org/Category:1.8.1_Rock_or_fluid_incompatibility 1.8.1 Rock or fluid incompatibility]
::[http://petrowiki.org/Category:1.8.1_Rock_fluid_incompatibility 1.8.1 Rock fluid incompatibility]


::[http://petrowiki.org/Category:1.8.2_Fluid_or_fluid__incompatibility 1.8.2 Fluid or fluid incompatibility]
::[http://petrowiki.org/Category:1.8.2_Fluid_fluid__incompatibility 1.8.2 Fluid fluid incompatibility]


::[http://petrowiki.org/Category:1.8.3_Fines_invasion 1.8.3 Fines invasion]
::[http://petrowiki.org/Category:1.8.3_Fines_invasion 1.8.3 Fines invasion]
Line 143: Line 143:
::[http://petrowiki.org/Category:1.11.5_Drilling_hydraulics 1.11.5 Drilling hydraulics]
::[http://petrowiki.org/Category:1.11.5_Drilling_hydraulics 1.11.5 Drilling hydraulics]


::[http://petrowiki.org/Category:1.11.6_Hpht_hydraulics 1.11.6 Hpht hydraulics]
::[http://petrowiki.org/Category:1.11.6_HPHT_hydraulics 1.11.6 HPHT hydraulics]


::[http://petrowiki.org/Category:1.11.7_Cuttings_transport 1.11.7 Cuttings transport]
::[http://petrowiki.org/Category:1.11.7_Cuttings_transport 1.11.7 Cuttings transport]
Line 159: Line 159:
::[http://petrowiki.org/Category:1.12.3_Mud_logging__and_surface_measurements 1.12.3 Mud logging and surface measurements]
::[http://petrowiki.org/Category:1.12.3_Mud_logging__and_surface_measurements 1.12.3 Mud logging and surface measurements]


::[http://petrowiki.org/Category:1.12.4_Real_time_data_transmission 1.12.4 Real time data transmission]
::[http://petrowiki.org/Category:1.12.4_Sensor_technology 1.12.4 Sensor Technology]


::[http://petrowiki.org/Category:1.12.5_Drilling_data_management 1.12.5 Drilling data management]
::[http://petrowiki.org/Category:1.12.5_Real_time_data_transmission 1.12.5 Real time data transmission]


:[http://petrowiki.org/Category:1.13_Casing_and_cementing 1.13 Casing and cementing]
::[http://petrowiki.org/Category:1.12.6_Drilling_data_management_and_standards 1.12.6 Drilling data management and standards]


::[http://petrowiki.org/Category:1.13.1_Casing_design 1.13.1 Casing design]
:[http://petrowiki.org/Category:1.13_Drilling_automation 1.13 Drilling automation]


::[http://petrowiki.org/Category:1.13.2_Casing_material_selection 1.13.2 Casing material selection]
::[http://petrowiki.org/Category:1.13.1_Surface_operations_automation 1.13.1 Surface operations automation]


::[http://petrowiki.org/Category:1.13.3_Cement_formulation 1.13.3 Cement formulation] (chemistry, properties)
::[http://petrowiki.org/Category:1.13.2_Downhole_operations_automation 1.13.2 Downhole operations automation]


::[http://petrowiki.org/Category:1.13.4_Cement_and_bond_evaluation 1.13.4 Cement and bond evaluation]
::[http://petrowiki.org/Category:1.13.3_Autonomous_downhole_tools 1.13.3 Autonomous downhole tools]


:[http://petrowiki.org/Category:1.14_Fundamental_research_in_drilling 1.14 Fundamental research in drilling]
:[http://petrowiki.org/Category:1.14_Casing_and_cementing 1.14 Casing and cementing]
 
::[http://petrowiki.org/Category:1.14.1_Casing_design 1.14.1 Casing design]
 
::[http://petrowiki.org/Category:1.14.2_Casing_material_selection 1.14.2 Casing material selection]
 
::[http://petrowiki.org/Category:1.14.3_Cement_formulation 1.14.3 Cement formulation] (chemistry, properties)
 
::[http://petrowiki.org/Category:1.14.4_Cement_and_bond_evaluation 1.14.4 Cement and bond evaluation]
 
:[http://petrowiki.org/Category:1.15_Fundamental_research_in_drilling 1.15 Fundamental research in drilling]


'''[[#Top|Back to top]]'''
'''[[#Top|Back to top]]'''
Line 179: Line 189:
==Completions==
==Completions==


;[http://petrowiki.org/Category:2_Well_completion 2 Well completion]
;[http://petrowiki.org/Category:2_Completions 2 Completions]


:[http://petrowiki.org/Category:2.1_Completion_operations 2.1 Completion operations]
:[http://petrowiki.org/Category:2.1_Completion_selection_and_design 2.1 Completion selection and design]


::[http://petrowiki.org/Category:2.1.1_Perforating 2.1.1 Perforating]
::[http://petrowiki.org/Category:2.1.1_Completion_selection 2.1.1 Completion selection]


::[http://petrowiki.org/Category:2.1.2_Fluid_loss_control 2.1.2 Fluid loss control]
::[http://petrowiki.org/Category:2.1.2_Production_tubing_design 2.1.2 Production tubing design]


::[http://petrowiki.org/Category:2.1.3_Sand_or_solids_control 2.1.3 Sand or solids control]
::[http://petrowiki.org/Category:2.1.3_Completion_equipment 2.1.3 Completion equipment]


::[http://petrowiki.org/Category:2.1.4_Screen_selection 2.1.4 Screen selection]
::[http://petrowiki.org/Category:2.1.4_Completion_load_modelling 2.1.4 Completion load modelling]


::[http://petrowiki.org/Category:2.1.5_Gravel_pack_design_and_evaluation 2.1.5 Gravel pack design and evaluation]
::[http://petrowiki.org/Category:2.1.5_Completion_materials 2.1.5 Completion materials]


::[http://petrowiki.org/Category:2.1.6_Frac_and_pack 2.1.6 Frac and pack]
::[http://petrowiki.org/Category:2.1.6_HPHT_completions_design 2.1.6 HPHT completions design]


::[http://petrowiki.org/Category:2.1.7_Deepwater_completions 2.1.7 Deepwater completions]
::[http://petrowiki.org/Category:2.1.7_Deepwater_completions_design 2.1.7 Deepwater completions design]


:[http://petrowiki.org/Category:2.2_Production_string_design_and_installation 2.2 Production string design and installation]
:[http://petrowiki.org/Category:2.2_Completion_installation_and_operations 2.2 Completion installation and operations]


::[http://petrowiki.org/Category:2.2.1_Tubular_optimization 2.2.1 Tubular optimization]
::[http://petrowiki.org/Category:2.2.1_Well_clean_out 2.2.1 Well clean out]


::[http://petrowiki.org/Category:2.2.2_Downhole_tools_and_equipment 2.2.2 Downhole tools and equipment]
::[http://petrowiki.org/Category:2.2.2_Perforating 2.2.2 Perforating]
 
::[http://petrowiki.org/Category:2.2.3_Fluid_loss_control 2.2.3 Fluid loss control]
 
::[http://petrowiki.org/Category:2.2.4_HPHT_completions_installation 2.2.4 HPHT completions installation]
 
::[http://petrowiki.org/Category:2.2.5_Deepwater_completions_installation 2.2.5 Deepwater completions installation]
 
::[http://petrowiki.org/Category:2.2.6_Coiled_tubing_operations 2.2.6 Coiled tubing operations]


'''[[#Top|Back to top]]'''
'''[[#Top|Back to top]]'''


:[http://petrowiki.org/Category:2.3_Well_monitoring_systems_or_intelligent_wells 2.3 Well monitoring systems or intelligent wells]
:[http://petrowiki.org/Category:2.3_Completion_monitoring_systems_/_intelligent_wells 2.3 Completion monitoring systems/intelligent wells]


::[http://petrowiki.org/Category:2.3.1_Remote_monitoring 2.3.1 Remote monitoring]
::[http://petrowiki.org/Category:2.3.1_Remote_monitoring 2.3.1 Remote monitoring]
Line 211: Line 229:
::[http://petrowiki.org/Category:2.3.2_Downhole_sensors_and_control_equipment 2.3.2 Downhole sensors and control equipment]
::[http://petrowiki.org/Category:2.3.2_Downhole_sensors_and_control_equipment 2.3.2 Downhole sensors and control equipment]


::[http://petrowiki.org/Category:2.3.3_Inflow_control_equipment 2.3.3 Inflow control equipment]
::[http://petrowiki.org/Category:2.3.3_Flow_control_equipment 2.3.3 Flow control equipment]


::[http://petrowiki.org/Category:2.3.4_Real_time_optimization 2.3.4 Real time optimization]
::[http://petrowiki.org/Category:2.3.4_Real_time_optimization 2.3.4 Real time optimization]
Line 217: Line 235:
::[http://petrowiki.org/Category:2.3.5_Completion_data_management 2.3.5 Completion data management]
::[http://petrowiki.org/Category:2.3.5_Completion_data_management 2.3.5 Completion data management]


:[http://petrowiki.org/Category:2.4_Completion_fluids_and_materials 2.4 Completion fluids and materials]
::[http://petrowiki.org/Category:2.3.6_Tubular_optimization 2.3.6 Tubular optimization]


::[http://petrowiki.org/Category:2.4.1_Completion_fluids 2.4.1 Completion fluids]
::[http://petrowiki.org/Category:2.3.7_Downhole_tools_and_equipment 2.3.7 Downhole tools and equipment]


::[http://petrowiki.org/Category:2.4.2_Proppants 2.4.2 Proppants]
:[http://petrowiki.org/Category:2.4_Sand_control 2.4 Sand control]
 
::[http://petrowiki.org/Category:2.4.3_Sand_/_solids_control 2.4.1 Sand/solids control]
 
::[http://petrowiki.org/Category:2.4.4_Screen_Selection 2.4.4 Screen selection]
 
::[http://petrowiki.org/Category:2.4.5_Gravel_pack_design_&_evaluation 2.4.5 Gravel pack design & evaluation]
 
::[http://petrowiki.org/Category:2.4.6_Frac_and_pack 2.4.6 Frac and pack]


:[http://petrowiki.org/Category:2.5_Hydraulic_fracturing 2.5 Hydraulic fracturing]
:[http://petrowiki.org/Category:2.5_Hydraulic_fracturing 2.5 Hydraulic fracturing]
Line 233: Line 259:
::[http://petrowiki.org/Category:2.5.4_Multistage_fracturing 2.5.4 Multistage fracturing]
::[http://petrowiki.org/Category:2.5.4_Multistage_fracturing 2.5.4 Multistage fracturing]


:[http://petrowiki.org/Category:2.6_Fundamental_research_in_well_completion 2.6 Fundamental research in well completion]
::[http://petrowiki.org/Category:2.5.5_Re-fracturing 2.5.5 Re-fracturing]
 
:[http://petrowiki.org/Category:2.6_Acidizing 2.6 Acidizing]
 
:[http://petrowiki.org/Category:2.7_Completion_fluids 2.7 Completion fluids]
 
::[http://petrowiki.org/Category:2.7.1_Completion_fluids 2.7.1 Completion fluids]
 
::[http://petrowiki.org/Category:2.7.2_Formation_damage_during_completion 2.7.2 Formation damage during completion]
 
:[http://petrowiki.org/Category:2.8_Completions_evaluation 2.8 Completions evaluation]
 
:[http://petrowiki.org/Category:2.9_Recompletion 2.9 Recompletion]
 
:[http://petrowiki.org/Category:2.10_Well_Integrity 2.10 Well Integrity]
 
::[http://petrowiki.org/Category:2.10.1_Design_for_well_integrity 2.10.1 Design for well integrity]
 
::[http://petrowiki.org/Category:2.10.2_Well_integrity_logging_and_monitoring 2.10.2 Well integrity logging and monitoring]
 
::[http://petrowiki.org/Category:2.10.3_Zonal_isolation 2.10.3 Zonal isolation]
 
::[http://petrowiki.org/Category:2.10.4_Subsurface_corrosion 2.10.4 Subsurface corrosion (tubing, casing, completion equipment, conductor)]
 
:[http://petrowiki.org/Category:2.11_Fundamental_research_in_well_completion 2.10 Fundamental research in well completion]


'''[[#Top|Back to top]]'''
'''[[#Top|Back to top]]'''
Line 259: Line 309:
::[http://petrowiki.org/Category:3.1.8_Gas_well_deliquification 3.1.8 Gas well deliquification]
::[http://petrowiki.org/Category:3.1.8_Gas_well_deliquification 3.1.8 Gas well deliquification]


:[http://petrowiki.org/Category:3.2_Well_operations,_optimization,_and_stimulation 3.2 Well operations, optimization, and stimulation]
:[http://petrowiki.org/Category:3.2_Well_operations_and_optimization 3.2 Well operations and optimization]


::[http://petrowiki.org/Category:3.2.1_Well_candidate_recognition 3.2.1 Well candidate recognition]
::[http://petrowiki.org/Category:3.2.1_Well_candidate_recognition 3.2.1 Well candidate recognition]
Line 265: Line 315:
::[http://petrowiki.org/Category:3.2.2_Downhole_intervention_and_remediation_(including_wireline_and_coiled_tubing) 3.2.2 Downhole intervention and remediation] (including wireline and coiled tubing)
::[http://petrowiki.org/Category:3.2.2_Downhole_intervention_and_remediation_(including_wireline_and_coiled_tubing) 3.2.2 Downhole intervention and remediation] (including wireline and coiled tubing)


::[http://petrowiki.org/Category:3.2.3_Hydraulic_fracturing_design,_implementation,_and_optimization 3.2.3 Hydraulic fracturing design, implementation, and optimization]
::[http://petrowiki.org/Category:3.2.3_Produced_sand/_solids_management_and_control 3.2.3 Produced sand/solids management and control]
 
::[http://petrowiki.org/Category:3.2.4_Acidizing 3.2.4 Acidizing]
 
::[http://petrowiki.org/Category:3.2.5_Produced_sand_or_solids_management_and_control 3.2.5 Produced sand or solids management and control]


::[http://petrowiki.org/Category:3.2.6_Produced_water_management_and_control 3.2.6 Produced water management and control]
::[http://petrowiki.org/Category:3.2.4_Produced_water_management_and_control 3.2.4 Produced water management and control]


::[http://petrowiki.org/Category:3.2.7_Downhole_fluids_separation,_management,_and_disposal 3.2.7 Downhole fluids separation, management, and disposal]
::[http://petrowiki.org/Category:3.2.5_Downhole_fluids_separation,_management_and_disposal 3.2.5 Downhole fluids separation management and disposal]


::[http://petrowiki.org/Category:3.2.8_Well_performance_modeling_and_tubular_optimization 3.2.8 Well performance modeling and tubular optimization]
::[http://petrowiki.org/Category:3.2.6_Well_performance_modeling 3.2.6 Well performance modeling]


::[http://petrowiki.org/Category:3.2.9_Lifecycle_management_and_planning_ 3.2.9 Lifecycle management and planning]
::[http://petrowiki.org/Category:3.2.7_Lifecycle_management_and_planning 3.2.7 Lifecycle management and planning]


'''[[#Top|Back to top]]'''
'''[[#Top|Back to top]]'''
Line 307: Line 353:
::[http://petrowiki.org/Category:3.4.5_Bacterial_contamination_and_control 3.4.5 Bacterial contamination and control]
::[http://petrowiki.org/Category:3.4.5_Bacterial_contamination_and_control 3.4.5 Bacterial contamination and control]


:[http://petrowiki.org/Category:3.5_Well_decommissioning__and_site_remediation 3.5 Well decommissioning and site remediation]
:[http://petrowiki.org/Category:3.5_Well_intervention 3.5 Well intervention]
 
::[http://petrowiki.org/Category:3.5.1_Candidate_selection 3.5.1 Candidate selection]
 
::[http://petrowiki.org/Category:3.5.2_Intervention_methods 3.5.2 Intervention methods]
 
::[http://petrowiki.org/Category:3.5.3_Through_tubing_well_intervention 3.5.3 Through tubing well intervention]
 
::[http://petrowiki.org/Category:3.5.4_Re-simulation_(excluding_re-fraccing) 3.5.4 Re-simulation (excluding re-fraccing)]
 
::[http://petrowiki.org/Category:3.5.5_Water_shut-off 3.5.5 Water shut-off]
 
::[http://petrowiki.org/Category:3.5.6_Pump_repairs 3.5.6 Pump repairs]
 
:[http://petrowiki.org/Category:3.6_Well_decommissioning 3.6 Well decommissioning]
 
::[http://petrowiki.org/Category:3.6.1_Well_plug_and_abandonment_methods,_design_and_selection 3.6.1 Well plug and abandonment methods, design and selection]
 
::[http://petrowiki.org/Category:3.6.2_Plugging_materials 3.6.2 Plugging materials]
 
::[http://petrowiki.org/Category:3.6.3_Well_plug_and_abandonment_operations 3.6.3 Well plug and abandonment operations]


:[http://petrowiki.org/Category:3.6_Fundamental_research_in_production_and_operations 3.6 Fundamental research in production and operations]
::[http://petrowiki.org/Category:3.6.4_Rigless_plug_and_abandonment 3.6.4 Rigless plug and abandonment]
 
:[http://petrowiki.org/Category:3.7_Fundamental_research_in_production_and_operations 3.7 Fundamental research in production and operations]


'''[[#Top|Back to top]]'''
'''[[#Top|Back to top]]'''
Line 463: Line 531:
'''[[#Top|Back to top]]'''
'''[[#Top|Back to top]]'''


==Reservoir description and dynamics==
==Reservoir==


;[http://petrowiki.org/Category:5_Reservoir_description_and_dynamics 5 Reservoir description and dynamics]
;[http://petrowiki.org/Category:5_Reservoir_description_and_dynamics 5 Reservoir description and dynamics]
Line 469: Line 537:
:[http://petrowiki.org/Category:5.1_Reservoir_characterization 5.1 Reservoir characterization]
:[http://petrowiki.org/Category:5.1_Reservoir_characterization 5.1 Reservoir characterization]


::
::[http://petrowiki.org/Category:5.1.1%20Exploration,%20development,%20and%20structural%20geology 5.1.1 Exploration, development, and structural geology]<br />


::[http://petrowiki.org/Category:5.1.1%20Exploration,%20development,%20and%20structural%20geology 5.1.1 Exploration, development, and structural geology]<br />
::<br />
::[http://petrowiki.org/Category:5.1.2_Faults_and_fracture_characterization 5.1.2 Faults and fracture characterization]
::[http://petrowiki.org/Category:5.1.2_Faults_and_fracture_characterization 5.1.2 Faults and fracture characterization]


Line 571: Line 637:
::[http://petrowiki.org/Category:5.6.7_Formation_test_analysis 5.6.7 Formation test analysis] (e.g., wireline, LWD)
::[http://petrowiki.org/Category:5.6.7_Formation_test_analysis 5.6.7 Formation test analysis] (e.g., wireline, LWD)


::[http://petrowiki.org/Category:5.6.8_Well_performance_monitoring_or_inflow_performance 5.6.8 Well performance monitoring or inflow performance]
::[http://petrowiki.org/Category:5.6.8_Well_performance_monitoring,_inflow_performance 5.6.8 Well performance monitoring, inflow performance]


::[http://petrowiki.org/Category:5.6.9_Production_forecasting 5.6.9 Production forecasting]
::[http://petrowiki.org/Category:5.6.9_Production_forecasting 5.6.9 Production forecasting]
Line 613: Line 679:
::[http://petrowiki.org/Category:5.8.8_Gas_condensate__reservoirs 5.8.8 Gas condensate reservoirs]
::[http://petrowiki.org/Category:5.8.8_Gas_condensate__reservoirs 5.8.8 Gas condensate reservoirs]


::[http://petrowiki.org/Category:5.8.9_Hp_or_ht_reservoirs 5.8.9 Hp or ht reservoirs]
::[http://petrowiki.org/Category:5.8.9_Hp/_ht_reservoirs 5.8.9 Hp/ht reservoirs]


:[http://petrowiki.org/Category:5.9_Non_traditional_resources 5.9 Non traditional resources]
:[http://petrowiki.org/Category:5.9_Non_traditional_resources 5.9 Non traditional resources]
Line 623: Line 689:
:[http://petrowiki.org/Category:5.10_Storage_reservoir_engineering 5.10 Storage reservoir engineering]
:[http://petrowiki.org/Category:5.10_Storage_reservoir_engineering 5.10 Storage reservoir engineering]


::[http://petrowiki.org/Category:5.10.1_Co2_capture_and_sequestration 5.10.1 Co2 capture and sequestration]
::[http://petrowiki.org/Category:5.10.1_CO2_capture_and_sequestration 5.10.1 CO2 capture and sequestration]


::[http://petrowiki.org/Category:5.10.2_Natural_gas_storage 5.10.2 Natural gas storage]
::[http://petrowiki.org/Category:5.10.2_Natural_gas_storage 5.10.2 Natural gas storage]
Line 631: Line 697:
'''[[#Top|Back to top]]'''
'''[[#Top|Back to top]]'''


==Health, safety, security, environment, and social responsibility==
==Health, safety, environment, and sustainability==


;[http://petrowiki.org/Category:6_Health,_safety,_security,_environment,__and_social_responsibility 6 Health, safety, security, environment, and social responsibility]
;[http://petrowiki.org/Category:6_Health,_safety,_security,_environment,__and_social_responsibility 6 Health, safety, environment, and sustainability]


:[http://petrowiki.org/Category:6.1_HSSE_and_social_responsibility_management 6.1 HSSE and social responsibility management]
:[http://petrowiki.org/Category:6.1_HSSE_and_management 6.1 HSES and management]


::[http://petrowiki.org/Category:6.1.1_HSSE_management_systems 6.1.1 HSSE management systems]
::[http://petrowiki.org/Category:6.1.1_HSSE_management_systems 6.1.1 HSES management systems]


::[http://petrowiki.org/Category:6.1.2_Hsse_reporting 6.1.2 HSSE reporting]
::[http://petrowiki.org/Category:6.1.2_Hsse_reporting 6.1.2 HSES reporting]


::[http://petrowiki.org/Category:6.1.3_HSSE_audit_and_certification 6.1.3 HSSE audit and certification]
::[http://petrowiki.org/Category:6.1.3_HSSE_audit_and_certification 6.1.3 HSES audit and certification]


::[http://petrowiki.org/Category:6.1.4_HSSE_standards,_regulations,_and_codes 6.1.4 HSSE standards, regulations, and codes]
::[http://petrowiki.org/Category:6.1.4_HSSE_standards,_regulations,_and_codes 6.1.4 HSES standards, regulations, and codes]


::[http://petrowiki.org/Category:6.1.5_Human_resources,_competence,_and_training 6.1.5 Human resources, competence, and training]
::[http://petrowiki.org/Category:6.1.5_Human_resources,_competence,_and_training 6.1.5 Human resources, competence, and training]
Line 711: Line 777:
::[http://petrowiki.org/Category:6.5.7_Climate_change 6.5.7 Climate change]
::[http://petrowiki.org/Category:6.5.7_Climate_change 6.5.7 Climate change]


:[http://petrowiki.org/Category:6.6_Sustainability_or_social_responsibility 6.6 Sustainability or social responsibility]
:[http://petrowiki.org/Category:6.6_Sustainability/_social_responsibility 6.6 Sustainability/social responsibility]


::[http://petrowiki.org/Category:6.6.1_Integrating_HSSE_into_the_business 6.6.1 Integrating HSSE into the business]
::[http://petrowiki.org/Category:6.6.1_Integrating_HSES_into_the_business 6.6.1 Integrating HSES into the business]


::[http://petrowiki.org/Category:6.6.2_Environmental_and_social_impact_assessments 6.6.2 Environmental and social impact assessments]
::[http://petrowiki.org/Category:6.6.2_Environmental_and_social_impact_assessments 6.6.2 Environmental and social impact assessments]
Line 725: Line 791:
::[http://petrowiki.org/Category:6.6.6_Partnership_and_communication 6.6.6 Partnership and communication]
::[http://petrowiki.org/Category:6.6.6_Partnership_and_communication 6.6.6 Partnership and communication]


:[http://petrowiki.org/Category:6.7_Fundamental_research_in_HSSE 6.7 Fundamental research in HSSE]
:[http://petrowiki.org/Category:6.7_Fundamental_research_in_HSES 6.7 Fundamental research in HSES]


'''[[#Top|Back to top]]'''
'''[[#Top|Back to top]]'''


==Management and information==
==Management==


;[http://petrowiki.org/Category:7_Management_and_information 7 Management and information]
;[http://petrowiki.org/Category:7_Management_and_information 7 Management]


:[http://petrowiki.org/Category:7.1_Asset_and_portfolio_management 7.1 Asset and portfolio management]
:[http://petrowiki.org/Category:7.1_Asset_and_portfolio_management 7.1 Asset and portfolio management]
Line 751: Line 817:
::[http://petrowiki.org/Category:7.1.8_Asset_integrity 7.1.8 Asset integrity]
::[http://petrowiki.org/Category:7.1.8_Asset_integrity 7.1.8 Asset integrity]


::[http://petrowiki.org/Category:7.1.9_Project_economics_or_valuation 7.1.9 Project economics or valuation]
::[http://petrowiki.org/Category:7.1.9_Project_economics/_valuation 7.1.9 Project economics/ valuation]


::[http://petrowiki.org/Category:7.1.10_Capital_budgeting_and_project_selection 7.1.10 Capital budgeting and project selection]
::[http://petrowiki.org/Category:7.1.10_Capital_budgeting_and_project_selection 7.1.10 Capital budgeting and project selection]
Line 809: Line 875:
==Data science and engineering analytics==
==Data science and engineering analytics==
'''[[:Category:8 Information management and systems|8 Data science and engineering analytics]]'''
'''[[:Category:8 Information management and systems|8 Data science and engineering analytics]]'''
:[http://petrowiki.org/Category:8.1_Information_management_and_systems 8.1 Information management and systems]


::[http://petrowiki.org/Category:8.1.1_Knowledge_management 8.1.1 Knowledge management]
::[http://petrowiki.org/Category:8.1.1_Knowledge_management 8.1.1 Knowledge management]
Automoderated users, Bureaucrats, contributors, diff, edit, industry, member, memberonlyaccess, moderaterevisions, Moderators, oldrevisions, override, Staff, Administrators, viewlinktolatest, watch, wysiwyg
1,003

edits

Navigation menu