Automoderated users, Bureaucrats, contributors, diff, edit, industry, member, memberonlyaccess, moderaterevisions, Moderators, oldrevisions, override, Staff, Administrators, viewlinktolatest, watch, wysiwyg
1,016
edits
You must log in to edit PetroWiki. Help with editing
Content of PetroWiki is intended for personal use only and to supplement, not replace, engineering judgment. SPE disclaims any and all liability for your use of such content. More information
m (Protected "Taxonomy": Taxonomy only changed by staff ([Edit=Allow only administrators] (indefinite) [Move=Allow only administrators] (indefinite)) [cascading]) |
|||
(36 intermediate revisions by 2 users not shown) | |||
Line 63: | Line 63: | ||
::[http://petrowiki.org/Category:1.6.5_Drilling_time_analysis 1.6.5 Drilling time analysis] | ::[http://petrowiki.org/Category:1.6.5_Drilling_time_analysis 1.6.5 Drilling time analysis] | ||
::[http://petrowiki.org/Category:1.6. | ::[http://petrowiki.org/Category:1.6.6_Directional_drilling 1.6.6 Directional drilling] | ||
::[http://petrowiki.org/Category:1.6. | ::[http://petrowiki.org/Category:1.6.7_Geosteering__/_reservoir_navigation 1.6.7 Geosteering /reservoir navigation] | ||
::[http://petrowiki.org/Category:1.6. | ::[http://petrowiki.org/Category:1.6.8_Through_tubing_rotary_drilling 1.6.8 Through tubing rotary drilling] | ||
::[http://petrowiki.org/Category:1.6. | ::[http://petrowiki.org/Category:1.6.9_Coring_,_fishing 1.6.9 Coring,fishing] | ||
::[http://petrowiki.org/Category:1.6. | ::[http://petrowiki.org/Category:1.6.10_Running_and_setting_casing 1.6.10 Running and setting casing] | ||
::[http://petrowiki.org/Category:1.6. | ::[http://petrowiki.org/Category:1.6.11_Plugging_and_abandonment 1.6.11 Plugging and abandonment] | ||
::[http://petrowiki.org/Category:1.6. | ::[http://petrowiki.org/Category:1.6.12_Coiled_tubing_drilling 1.6.12 Coiled tubing drilling] | ||
'''[[#Top|Back to top]]''' | '''[[#Top|Back to top]]''' | ||
Line 95: | Line 95: | ||
:[http://petrowiki.org/Category:1.8_Formation_damage 1.8 Formation damage] | :[http://petrowiki.org/Category:1.8_Formation_damage 1.8 Formation damage] | ||
::[http://petrowiki.org/Category:1.8. | ::[http://petrowiki.org/Category:1.8.1_Rock_fluid_incompatibility 1.8.1 Rock fluid incompatibility] | ||
::[http://petrowiki.org/Category:1.8. | ::[http://petrowiki.org/Category:1.8.2_Fluid_fluid__incompatibility 1.8.2 Fluid fluid incompatibility] | ||
::[http://petrowiki.org/Category:1.8.3_Fines_invasion 1.8.3 Fines invasion] | ::[http://petrowiki.org/Category:1.8.3_Fines_invasion 1.8.3 Fines invasion] | ||
Line 143: | Line 143: | ||
::[http://petrowiki.org/Category:1.11.5_Drilling_hydraulics 1.11.5 Drilling hydraulics] | ::[http://petrowiki.org/Category:1.11.5_Drilling_hydraulics 1.11.5 Drilling hydraulics] | ||
::[http://petrowiki.org/Category:1.11. | ::[http://petrowiki.org/Category:1.11.6_HPHT_hydraulics 1.11.6 HPHT hydraulics] | ||
::[http://petrowiki.org/Category:1.11.7_Cuttings_transport 1.11.7 Cuttings transport] | ::[http://petrowiki.org/Category:1.11.7_Cuttings_transport 1.11.7 Cuttings transport] | ||
Line 159: | Line 159: | ||
::[http://petrowiki.org/Category:1.12.3_Mud_logging__and_surface_measurements 1.12.3 Mud logging and surface measurements] | ::[http://petrowiki.org/Category:1.12.3_Mud_logging__and_surface_measurements 1.12.3 Mud logging and surface measurements] | ||
::[http://petrowiki.org/Category:1.12. | ::[http://petrowiki.org/Category:1.12.4_Sensor_technology 1.12.4 Sensor Technology] | ||
::[http://petrowiki.org/Category:1.12. | ::[http://petrowiki.org/Category:1.12.5_Real_time_data_transmission 1.12.5 Real time data transmission] | ||
:[http://petrowiki.org/Category:1. | ::[http://petrowiki.org/Category:1.12.6_Drilling_data_management_and_standards 1.12.6 Drilling data management and standards] | ||
:[http://petrowiki.org/Category:1.13_Drilling_automation 1.13 Drilling automation] | |||
::[http://petrowiki.org/Category:1.13. | ::[http://petrowiki.org/Category:1.13.1_Surface_operations_automation 1.13.1 Surface operations automation] | ||
::[http://petrowiki.org/Category:1.13. | ::[http://petrowiki.org/Category:1.13.2_Downhole_operations_automation 1.13.2 Downhole operations automation] | ||
::[http://petrowiki.org/Category:1.13. | ::[http://petrowiki.org/Category:1.13.3_Autonomous_downhole_tools 1.13.3 Autonomous downhole tools] | ||
:[http://petrowiki.org/Category:1. | :[http://petrowiki.org/Category:1.14_Casing_and_cementing 1.14 Casing and cementing] | ||
::[http://petrowiki.org/Category:1.14.1_Casing_design 1.14.1 Casing design] | |||
::[http://petrowiki.org/Category:1.14.2_Casing_material_selection 1.14.2 Casing material selection] | |||
::[http://petrowiki.org/Category:1.14.3_Cement_formulation 1.14.3 Cement formulation] (chemistry, properties) | |||
::[http://petrowiki.org/Category:1.14.4_Cement_and_bond_evaluation 1.14.4 Cement and bond evaluation] | |||
:[http://petrowiki.org/Category:1.15_Fundamental_research_in_drilling 1.15 Fundamental research in drilling] | |||
'''[[#Top|Back to top]]''' | '''[[#Top|Back to top]]''' | ||
Line 179: | Line 189: | ||
==Completions== | ==Completions== | ||
;[http://petrowiki.org/Category: | ;[http://petrowiki.org/Category:2_Completions 2 Completions] | ||
:[http://petrowiki.org/Category:2. | :[http://petrowiki.org/Category:2.1_Completion_selection_and_design 2.1 Completion selection and design] | ||
::[http://petrowiki.org/Category:2.1. | ::[http://petrowiki.org/Category:2.1.1_Completion_selection 2.1.1 Completion selection] | ||
::[http://petrowiki.org/Category:2.1. | ::[http://petrowiki.org/Category:2.1.2_Production_tubing_design 2.1.2 Production tubing design] | ||
::[http://petrowiki.org/Category:2.1. | ::[http://petrowiki.org/Category:2.1.3_Completion_equipment 2.1.3 Completion equipment] | ||
::[http://petrowiki.org/Category:2.1. | ::[http://petrowiki.org/Category:2.1.4_Completion_load_modelling 2.1.4 Completion load modelling] | ||
::[http://petrowiki.org/Category:2.1. | ::[http://petrowiki.org/Category:2.1.5_Completion_materials 2.1.5 Completion materials] | ||
::[http://petrowiki.org/Category:2.1. | ::[http://petrowiki.org/Category:2.1.6_HPHT_completions_design 2.1.6 HPHT completions design] | ||
::[http://petrowiki.org/Category:2.1. | ::[http://petrowiki.org/Category:2.1.7_Deepwater_completions_design 2.1.7 Deepwater completions design] | ||
:[http://petrowiki.org/Category:2. | :[http://petrowiki.org/Category:2.2_Completion_installation_and_operations 2.2 Completion installation and operations] | ||
::[http://petrowiki.org/Category:2.2. | ::[http://petrowiki.org/Category:2.2.1_Well_clean_out 2.2.1 Well clean out] | ||
::[http://petrowiki.org/Category:2.2. | ::[http://petrowiki.org/Category:2.2.2_Perforating 2.2.2 Perforating] | ||
::[http://petrowiki.org/Category:2.2.3_Fluid_loss_control 2.2.3 Fluid loss control] | |||
::[http://petrowiki.org/Category:2.2.4_HPHT_completions_installation 2.2.4 HPHT completions installation] | |||
::[http://petrowiki.org/Category:2.2.5_Deepwater_completions_installation 2.2.5 Deepwater completions installation] | |||
::[http://petrowiki.org/Category:2.2.6_Coiled_tubing_operations 2.2.6 Coiled tubing operations] | |||
'''[[#Top|Back to top]]''' | '''[[#Top|Back to top]]''' | ||
:[http://petrowiki.org/Category:2. | :[http://petrowiki.org/Category:2.3_Completion_monitoring_systems_/_intelligent_wells 2.3 Completion monitoring systems/intelligent wells] | ||
::[http://petrowiki.org/Category:2.3.1_Remote_monitoring 2.3.1 Remote monitoring] | ::[http://petrowiki.org/Category:2.3.1_Remote_monitoring 2.3.1 Remote monitoring] | ||
Line 211: | Line 229: | ||
::[http://petrowiki.org/Category:2.3.2_Downhole_sensors_and_control_equipment 2.3.2 Downhole sensors and control equipment] | ::[http://petrowiki.org/Category:2.3.2_Downhole_sensors_and_control_equipment 2.3.2 Downhole sensors and control equipment] | ||
::[http://petrowiki.org/Category:2.3. | ::[http://petrowiki.org/Category:2.3.3_Flow_control_equipment 2.3.3 Flow control equipment] | ||
::[http://petrowiki.org/Category:2.3.4_Real_time_optimization 2.3.4 Real time optimization] | ::[http://petrowiki.org/Category:2.3.4_Real_time_optimization 2.3.4 Real time optimization] | ||
Line 217: | Line 235: | ||
::[http://petrowiki.org/Category:2.3.5_Completion_data_management 2.3.5 Completion data management] | ::[http://petrowiki.org/Category:2.3.5_Completion_data_management 2.3.5 Completion data management] | ||
:[http://petrowiki.org/Category:2. | ::[http://petrowiki.org/Category:2.3.6_Tubular_optimization 2.3.6 Tubular optimization] | ||
::[http://petrowiki.org/Category:2. | ::[http://petrowiki.org/Category:2.3.7_Downhole_tools_and_equipment 2.3.7 Downhole tools and equipment] | ||
::[http://petrowiki.org/Category:2.4. | :[http://petrowiki.org/Category:2.4_Sand_control 2.4 Sand control] | ||
::[http://petrowiki.org/Category:2.4.3_Sand_/_solids_control 2.4.1 Sand/solids control] | |||
::[http://petrowiki.org/Category:2.4.4_Screen_Selection 2.4.4 Screen selection] | |||
::[http://petrowiki.org/Category:2.4.5_Gravel_pack_design_&_evaluation 2.4.5 Gravel pack design & evaluation] | |||
::[http://petrowiki.org/Category:2.4.6_Frac_and_pack 2.4.6 Frac and pack] | |||
:[http://petrowiki.org/Category:2.5_Hydraulic_fracturing 2.5 Hydraulic fracturing] | :[http://petrowiki.org/Category:2.5_Hydraulic_fracturing 2.5 Hydraulic fracturing] | ||
Line 233: | Line 259: | ||
::[http://petrowiki.org/Category:2.5.4_Multistage_fracturing 2.5.4 Multistage fracturing] | ::[http://petrowiki.org/Category:2.5.4_Multistage_fracturing 2.5.4 Multistage fracturing] | ||
:[http://petrowiki.org/Category:2. | ::[http://petrowiki.org/Category:2.5.5_Re-fracturing 2.5.5 Re-fracturing] | ||
:[http://petrowiki.org/Category:2.6_Acidizing 2.6 Acidizing] | |||
:[http://petrowiki.org/Category:2.7_Completion_fluids 2.7 Completion fluids] | |||
::[http://petrowiki.org/Category:2.7.1_Completion_fluids 2.7.1 Completion fluids] | |||
::[http://petrowiki.org/Category:2.7.2_Formation_damage_during_completion 2.7.2 Formation damage during completion] | |||
:[http://petrowiki.org/Category:2.8_Completions_evaluation 2.8 Completions evaluation] | |||
:[http://petrowiki.org/Category:2.9_Recompletion 2.9 Recompletion] | |||
:[http://petrowiki.org/Category:2.10_Well_Integrity 2.10 Well Integrity] | |||
::[http://petrowiki.org/Category:2.10.1_Design_for_well_integrity 2.10.1 Design for well integrity] | |||
::[http://petrowiki.org/Category:2.10.2_Well_integrity_logging_and_monitoring 2.10.2 Well integrity logging and monitoring] | |||
::[http://petrowiki.org/Category:2.10.3_Zonal_isolation 2.10.3 Zonal isolation] | |||
::[http://petrowiki.org/Category:2.10.4_Subsurface_corrosion 2.10.4 Subsurface corrosion (tubing, casing, completion equipment, conductor)] | |||
:[http://petrowiki.org/Category:2.11_Fundamental_research_in_well_completion 2.10 Fundamental research in well completion] | |||
'''[[#Top|Back to top]]''' | '''[[#Top|Back to top]]''' | ||
Line 239: | Line 289: | ||
==Production and operations== | ==Production and operations== | ||
:[http://petrowiki.org/Category: | :[http://petrowiki.org/Category:3_Production_and_operations 3 Production and well operations] | ||
::[http://petrowiki.org/Category:3.1__Artificial_lift_systems 3.1 Artificial lift systems] | ::[http://petrowiki.org/Category:3.1__Artificial_lift_systems 3.1 Artificial lift systems] | ||
Line 259: | Line 309: | ||
::[http://petrowiki.org/Category:3.1.8_Gas_well_deliquification 3.1.8 Gas well deliquification] | ::[http://petrowiki.org/Category:3.1.8_Gas_well_deliquification 3.1.8 Gas well deliquification] | ||
:[http://petrowiki.org/Category:3. | :[http://petrowiki.org/Category:3.2_Well_operations_and_optimization 3.2 Well operations and optimization] | ||
::[http://petrowiki.org/Category:3.2.1_Well_candidate_recognition 3.2.1 Well candidate recognition] | ::[http://petrowiki.org/Category:3.2.1_Well_candidate_recognition 3.2.1 Well candidate recognition] | ||
Line 265: | Line 315: | ||
::[http://petrowiki.org/Category:3.2.2_Downhole_intervention_and_remediation_(including_wireline_and_coiled_tubing) 3.2.2 Downhole intervention and remediation] (including wireline and coiled tubing) | ::[http://petrowiki.org/Category:3.2.2_Downhole_intervention_and_remediation_(including_wireline_and_coiled_tubing) 3.2.2 Downhole intervention and remediation] (including wireline and coiled tubing) | ||
::[http://petrowiki.org/Category:3.2. | ::[http://petrowiki.org/Category:3.2.3_Produced_sand/_solids_management_and_control 3.2.3 Produced sand/solids management and control] | ||
::[http://petrowiki.org/Category:3.2. | ::[http://petrowiki.org/Category:3.2.4_Produced_water_management_and_control 3.2.4 Produced water management and control] | ||
::[http://petrowiki.org/Category:3.2. | ::[http://petrowiki.org/Category:3.2.5_Downhole_fluids_separation,_management_and_disposal 3.2.5 Downhole fluids separation management and disposal] | ||
::[http://petrowiki.org/Category:3.2. | ::[http://petrowiki.org/Category:3.2.6_Well_performance_modeling 3.2.6 Well performance modeling] | ||
::[http://petrowiki.org/Category:3.2. | ::[http://petrowiki.org/Category:3.2.7_Lifecycle_management_and_planning 3.2.7 Lifecycle management and planning] | ||
'''[[#Top|Back to top]]''' | '''[[#Top|Back to top]]''' | ||
Line 307: | Line 353: | ||
::[http://petrowiki.org/Category:3.4.5_Bacterial_contamination_and_control 3.4.5 Bacterial contamination and control] | ::[http://petrowiki.org/Category:3.4.5_Bacterial_contamination_and_control 3.4.5 Bacterial contamination and control] | ||
:[http://petrowiki.org/Category:3. | :[http://petrowiki.org/Category:3.5_Well_intervention 3.5 Well intervention] | ||
::[http://petrowiki.org/Category:3.5.1_Candidate_selection 3.5.1 Candidate selection] | |||
::[http://petrowiki.org/Category:3.5.2_Intervention_methods 3.5.2 Intervention methods] | |||
::[http://petrowiki.org/Category:3.5.3_Through_tubing_well_intervention 3.5.3 Through tubing well intervention] | |||
::[http://petrowiki.org/Category:3.5.4_Re-simulation_(excluding_re-fraccing) 3.5.4 Re-simulation (excluding re-fraccing)] | |||
::[http://petrowiki.org/Category:3.5.5_Water_shut-off 3.5.5 Water shut-off] | |||
::[http://petrowiki.org/Category:3.5.6_Pump_repairs 3.5.6 Pump repairs] | |||
:[http://petrowiki.org/Category:3.6_Well_decommissioning 3.6 Well decommissioning] | |||
::[http://petrowiki.org/Category:3.6.1_Well_plug_and_abandonment_methods,_design_and_selection 3.6.1 Well plug and abandonment methods, design and selection] | |||
::[http://petrowiki.org/Category:3.6.2_Plugging_materials 3.6.2 Plugging materials] | |||
::[http://petrowiki.org/Category:3.6.3_Well_plug_and_abandonment_operations 3.6.3 Well plug and abandonment operations] | |||
:[http://petrowiki.org/Category:3. | ::[http://petrowiki.org/Category:3.6.4_Rigless_plug_and_abandonment 3.6.4 Rigless plug and abandonment] | ||
:[http://petrowiki.org/Category:3.7_Fundamental_research_in_production_and_operations 3.7 Fundamental research in production and operations] | |||
'''[[#Top|Back to top]]''' | '''[[#Top|Back to top]]''' | ||
== | ==Projects, facilities, and construction== | ||
;[http://petrowiki.org/Category:4_Facilities_design,_construction,_and_operation 4 Facilities design, construction, and operation] | ;[http://petrowiki.org/Category:4_Facilities_design,_construction,_and_operation 4 Facilities design, construction, and operation] | ||
Line 463: | Line 531: | ||
'''[[#Top|Back to top]]''' | '''[[#Top|Back to top]]''' | ||
==Reservoir | ==Reservoir== | ||
;[http://petrowiki.org/Category:5_Reservoir_description_and_dynamics 5 Reservoir description and dynamics] | ;[http://petrowiki.org/Category:5_Reservoir_description_and_dynamics 5 Reservoir description and dynamics] | ||
Line 469: | Line 537: | ||
:[http://petrowiki.org/Category:5.1_Reservoir_characterization 5.1 Reservoir characterization] | :[http://petrowiki.org/Category:5.1_Reservoir_characterization 5.1 Reservoir characterization] | ||
:: | ::[http://petrowiki.org/Category:5.1.1%20Exploration,%20development,%20and%20structural%20geology 5.1.1 Exploration, development, and structural geology]<br /> | ||
::[http://petrowiki.org/Category:5.1.2_Faults_and_fracture_characterization 5.1.2 Faults and fracture characterization] | ::[http://petrowiki.org/Category:5.1.2_Faults_and_fracture_characterization 5.1.2 Faults and fracture characterization] | ||
Line 571: | Line 637: | ||
::[http://petrowiki.org/Category:5.6.7_Formation_test_analysis 5.6.7 Formation test analysis] (e.g., wireline, LWD) | ::[http://petrowiki.org/Category:5.6.7_Formation_test_analysis 5.6.7 Formation test analysis] (e.g., wireline, LWD) | ||
::[http://petrowiki.org/Category:5.6. | ::[http://petrowiki.org/Category:5.6.8_Well_performance_monitoring,_inflow_performance 5.6.8 Well performance monitoring, inflow performance] | ||
::[http://petrowiki.org/Category:5.6.9_Production_forecasting 5.6.9 Production forecasting] | ::[http://petrowiki.org/Category:5.6.9_Production_forecasting 5.6.9 Production forecasting] | ||
Line 613: | Line 679: | ||
::[http://petrowiki.org/Category:5.8.8_Gas_condensate__reservoirs 5.8.8 Gas condensate reservoirs] | ::[http://petrowiki.org/Category:5.8.8_Gas_condensate__reservoirs 5.8.8 Gas condensate reservoirs] | ||
::[http://petrowiki.org/Category:5.8. | ::[http://petrowiki.org/Category:5.8.9_Hp/_ht_reservoirs 5.8.9 Hp/ht reservoirs] | ||
:[http://petrowiki.org/Category:5.9_Non_traditional_resources 5.9 Non traditional resources] | :[http://petrowiki.org/Category:5.9_Non_traditional_resources 5.9 Non traditional resources] | ||
Line 623: | Line 689: | ||
:[http://petrowiki.org/Category:5.10_Storage_reservoir_engineering 5.10 Storage reservoir engineering] | :[http://petrowiki.org/Category:5.10_Storage_reservoir_engineering 5.10 Storage reservoir engineering] | ||
::[http://petrowiki.org/Category:5.10. | ::[http://petrowiki.org/Category:5.10.1_CO2_capture_and_sequestration 5.10.1 CO2 capture and sequestration] | ||
::[http://petrowiki.org/Category:5.10.2_Natural_gas_storage 5.10.2 Natural gas storage] | ::[http://petrowiki.org/Category:5.10.2_Natural_gas_storage 5.10.2 Natural gas storage] | ||
Line 631: | Line 697: | ||
'''[[#Top|Back to top]]''' | '''[[#Top|Back to top]]''' | ||
==Health, safety | ==Health, safety, environment, and sustainability== | ||
;[http://petrowiki.org/Category:6_Health,_safety,_security,_environment,__and_social_responsibility 6 Health, safety | ;[http://petrowiki.org/Category:6_Health,_safety,_security,_environment,__and_social_responsibility 6 Health, safety, environment, and sustainability] | ||
:[http://petrowiki.org/Category:6. | :[http://petrowiki.org/Category:6.1_HSSE_and_management 6.1 HSES and management] | ||
::[http://petrowiki.org/Category:6.1.1_HSSE_management_systems 6.1.1 | ::[http://petrowiki.org/Category:6.1.1_HSSE_management_systems 6.1.1 HSES management systems] | ||
::[http://petrowiki.org/Category:6.1.2_Hsse_reporting 6.1.2 | ::[http://petrowiki.org/Category:6.1.2_Hsse_reporting 6.1.2 HSES reporting] | ||
::[http://petrowiki.org/Category:6.1.3_HSSE_audit_and_certification 6.1.3 | ::[http://petrowiki.org/Category:6.1.3_HSSE_audit_and_certification 6.1.3 HSES audit and certification] | ||
::[http://petrowiki.org/Category:6.1.4_HSSE_standards,_regulations,_and_codes 6.1.4 | ::[http://petrowiki.org/Category:6.1.4_HSSE_standards,_regulations,_and_codes 6.1.4 HSES standards, regulations, and codes] | ||
::[http://petrowiki.org/Category:6.1.5_Human_resources,_competence,_and_training 6.1.5 Human resources, competence, and training] | ::[http://petrowiki.org/Category:6.1.5_Human_resources,_competence,_and_training 6.1.5 Human resources, competence, and training] | ||
Line 711: | Line 777: | ||
::[http://petrowiki.org/Category:6.5.7_Climate_change 6.5.7 Climate change] | ::[http://petrowiki.org/Category:6.5.7_Climate_change 6.5.7 Climate change] | ||
:[http://petrowiki.org/Category:6. | :[http://petrowiki.org/Category:6.6_Sustainability/_social_responsibility 6.6 Sustainability/social responsibility] | ||
::[http://petrowiki.org/Category:6.6. | ::[http://petrowiki.org/Category:6.6.1_Integrating_HSES_into_the_business 6.6.1 Integrating HSES into the business] | ||
::[http://petrowiki.org/Category:6.6.2_Environmental_and_social_impact_assessments 6.6.2 Environmental and social impact assessments] | ::[http://petrowiki.org/Category:6.6.2_Environmental_and_social_impact_assessments 6.6.2 Environmental and social impact assessments] | ||
Line 725: | Line 791: | ||
::[http://petrowiki.org/Category:6.6.6_Partnership_and_communication 6.6.6 Partnership and communication] | ::[http://petrowiki.org/Category:6.6.6_Partnership_and_communication 6.6.6 Partnership and communication] | ||
:[http://petrowiki.org/Category:6. | :[http://petrowiki.org/Category:6.7_Fundamental_research_in_HSES 6.7 Fundamental research in HSES] | ||
'''[[#Top|Back to top]]''' | '''[[#Top|Back to top]]''' | ||
==Management | ==Management== | ||
;[http://petrowiki.org/Category:7_Management_and_information 7 Management | ;[http://petrowiki.org/Category:7_Management_and_information 7 Management] | ||
:[http://petrowiki.org/Category:7.1_Asset_and_portfolio_management 7.1 Asset and portfolio management] | :[http://petrowiki.org/Category:7.1_Asset_and_portfolio_management 7.1 Asset and portfolio management] | ||
Line 751: | Line 817: | ||
::[http://petrowiki.org/Category:7.1.8_Asset_integrity 7.1.8 Asset integrity] | ::[http://petrowiki.org/Category:7.1.8_Asset_integrity 7.1.8 Asset integrity] | ||
::[http://petrowiki.org/Category:7.1. | ::[http://petrowiki.org/Category:7.1.9_Project_economics/_valuation 7.1.9 Project economics/ valuation] | ||
::[http://petrowiki.org/Category:7.1.10_Capital_budgeting_and_project_selection 7.1.10 Capital budgeting and project selection] | ::[http://petrowiki.org/Category:7.1.10_Capital_budgeting_and_project_selection 7.1.10 Capital budgeting and project selection] | ||
Line 809: | Line 875: | ||
==Data science and engineering analytics== | ==Data science and engineering analytics== | ||
'''[[:Category:8 Information management and systems|8 Data science and engineering analytics]]''' | '''[[:Category:8 Information management and systems|8 Data science and engineering analytics]]''' | ||
:[http://petrowiki.org/Category:8.1_Information_management_and_systems 8.1 Information management and systems] | |||
::[http://petrowiki.org/Category:8.1.1_Knowledge_management 8.1.1 Knowledge management] | ::[http://petrowiki.org/Category:8.1.1_Knowledge_management 8.1.1 Knowledge management] |
edits