You must log in to edit PetroWiki. Help with editing
Content of PetroWiki is intended for personal use only and to supplement, not replace, engineering judgment. SPE disclaims any and all liability for your use of such content. More information
Taxonomy: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
m (Protected "Taxonomy": Taxonomy only changed by staff ([Edit=Allow only administrators] (indefinite) [Move=Allow only administrators] (indefinite)) [cascading]) |
||
(94 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
== | ==Drilling== | ||
;[http://petrowiki.org/Category:1_Well_drilling 1 | ;[http://petrowiki.org/Category:1_Well_drilling 1 Drilling] | ||
:[http://petrowiki.org/Category:1.1_Well_planning 1.1 Well planning] | :[http://petrowiki.org/Category:1.1_Well_planning 1.1 Well planning] | ||
Line 7: | Line 7: | ||
::[http://petrowiki.org/Category:1.1.1_Well_site_preparation 1.1.1 Well site preparation] | ::[http://petrowiki.org/Category:1.1.1_Well_site_preparation 1.1.1 Well site preparation] | ||
::[http://petrowiki.org/Category:1.1.2_Authority_for_expenditures_(AFE) 1.1.2 Authority for expenditures (AFE)] | ::[http://petrowiki.org/Category:1.1.2_Authority_for_expenditures_(AFE) 1.1.2 Authority for expenditures (AFE)] | ||
::[http://petrowiki.org/Category:1.1.3_Trajectory_design 1.1.3 Trajectory design] | ::[http://petrowiki.org/Category:1.1.3_Trajectory_design 1.1.3 Trajectory design] | ||
:[http://petrowiki.org/Category:1.2_Wellbore_design_ 1.2 Wellbore design ] | :[http://petrowiki.org/Category:1.2_Wellbore_design_ 1.2 Wellbore design] | ||
::[http://petrowiki.org/Category:1.2.1_Wellbore_integrity 1.2.1 Wellbore integrity] | ::[http://petrowiki.org/Category:1.2.1_Wellbore_integrity 1.2.1 Wellbore integrity] | ||
Line 25: | Line 25: | ||
::[http://petrowiki.org/Category:1.3.2_Subsea_wellheads 1.3.2 Subsea wellheads] | ::[http://petrowiki.org/Category:1.3.2_Subsea_wellheads 1.3.2 Subsea wellheads] | ||
::[http://petrowiki.org/Category:1.3.3_Wellhead_integrity 1.3.3 Wellhead integrity ] | ::[http://petrowiki.org/Category:1.3.3_Wellhead_integrity 1.3.3 Wellhead integrity] | ||
'''[[#Top|Back to top]]''' | '''[[#Top|Back to top]]''' | ||
Line 45: | Line 45: | ||
::[http://petrowiki.org/Category:1.5.1_Bit_design 1.5.1 Bit design] | ::[http://petrowiki.org/Category:1.5.1_Bit_design 1.5.1 Bit design] | ||
::[http://petrowiki.org/Category:1.5.2_Bit__rock_interactions 1.5.2 Bit | ::[http://petrowiki.org/Category:1.5.2_Bit__rock_interactions 1.5.2 Bit rock interactions] | ||
::[http://petrowiki.org/Category:1.5.3_Drill_bit_materials 1.5.3 Drill bit materials] | ::[http://petrowiki.org/Category:1.5.3_Drill_bit_materials 1.5.3 Drill bit materials] | ||
Line 53: | Line 53: | ||
:[http://petrowiki.org/Category:1.6_Drilling_operations 1.6 Drilling operations] | :[http://petrowiki.org/Category:1.6_Drilling_operations 1.6 Drilling operations] | ||
::[http://petrowiki.org/Category:1.6.1__Drilling_operation_management 1.6.1 | ::[http://petrowiki.org/Category:1.6.1__Drilling_operation_management 1.6.1 Drilling operation management] | ||
::[http://petrowiki.org/Category:1.6.2__Technical_limit_drilling 1.6.2 | ::[http://petrowiki.org/Category:1.6.2__Technical_limit_drilling 1.6.2 Technical limit drilling] | ||
::[http://petrowiki.org/Category:1.6.3_Drilling_optimization 1.6.3 Drilling optimization] | ::[http://petrowiki.org/Category:1.6.3_Drilling_optimization 1.6.3 Drilling optimization] | ||
Line 63: | Line 63: | ||
::[http://petrowiki.org/Category:1.6.5_Drilling_time_analysis 1.6.5 Drilling time analysis] | ::[http://petrowiki.org/Category:1.6.5_Drilling_time_analysis 1.6.5 Drilling time analysis] | ||
::[http://petrowiki.org/Category:1.6. | ::[http://petrowiki.org/Category:1.6.6_Directional_drilling 1.6.6 Directional drilling] | ||
::[http://petrowiki.org/Category:1.6. | ::[http://petrowiki.org/Category:1.6.7_Geosteering__/_reservoir_navigation 1.6.7 Geosteering /reservoir navigation] | ||
::[http://petrowiki.org/Category:1.6. | ::[http://petrowiki.org/Category:1.6.8_Through_tubing_rotary_drilling 1.6.8 Through tubing rotary drilling] | ||
::[http://petrowiki.org/Category:1.6. | ::[http://petrowiki.org/Category:1.6.9_Coring_,_fishing 1.6.9 Coring,fishing] | ||
::[http://petrowiki.org/Category:1.6. | ::[http://petrowiki.org/Category:1.6.10_Running_and_setting_casing 1.6.10 Running and setting casing] | ||
::[http://petrowiki.org/Category:1.6. | ::[http://petrowiki.org/Category:1.6.11_Plugging_and_abandonment 1.6.11 Plugging and abandonment] | ||
::[http://petrowiki.org/Category:1.6. | ::[http://petrowiki.org/Category:1.6.12_Coiled_tubing_drilling 1.6.12 Coiled tubing drilling] | ||
'''[[#Top|Back to top]]''' | '''[[#Top|Back to top]]''' | ||
Line 89: | Line 89: | ||
::[http://petrowiki.org/Category:1.7.4_Pressure_effects_in_drilling 1.7.4 Pressure effects in drilling] | ::[http://petrowiki.org/Category:1.7.4_Pressure_effects_in_drilling 1.7.4 Pressure effects in drilling] | ||
::[http://petrowiki.org/Category:1.7.5_Well_control 1.7.5 Well control | ::[http://petrowiki.org/Category:1.7.5_Well_control 1.7.5 Well control] | ||
::[http://petrowiki.org/Category:1.7.6_Wellbore_pressure_management 1.7.6 Wellbore pressure management] | ::[http://petrowiki.org/Category:1.7.6_Wellbore_pressure_management 1.7.6 Wellbore pressure management] | ||
Line 95: | Line 95: | ||
:[http://petrowiki.org/Category:1.8_Formation_damage 1.8 Formation damage] | :[http://petrowiki.org/Category:1.8_Formation_damage 1.8 Formation damage] | ||
::[http://petrowiki.org/Category:1.8. | ::[http://petrowiki.org/Category:1.8.1_Rock_fluid_incompatibility 1.8.1 Rock fluid incompatibility] | ||
::[http://petrowiki.org/Category:1.8. | ::[http://petrowiki.org/Category:1.8.2_Fluid_fluid__incompatibility 1.8.2 Fluid fluid incompatibility] | ||
::[http://petrowiki.org/Category:1.8.3_Fines_invasion 1.8.3 Fines invasion] | ::[http://petrowiki.org/Category:1.8.3_Fines_invasion 1.8.3 Fines invasion] | ||
Line 111: | Line 111: | ||
::[http://petrowiki.org/Category:1.9.2_Survey_calculations_and_error_models 1.9.2 Survey calculations and error models] | ::[http://petrowiki.org/Category:1.9.2_Survey_calculations_and_error_models 1.9.2 Survey calculations and error models] | ||
::[http://petrowiki.org/Category:1.9.3_Anti_collision_analysis 1.9.3 Anti collision analysis ] | ::[http://petrowiki.org/Category:1.9.3_Anti_collision_analysis 1.9.3 Anti collision analysis] | ||
::[http://petrowiki.org/Category:1.9.4_Survey_tools 1.9.4 Survey tools ] | ::[http://petrowiki.org/Category:1.9.4_Survey_tools 1.9.4 Survey tools] | ||
::[http://petrowiki.org/Category:1.9.5_Ranging_tools_and_proximity_calculation 1.9.5 Ranging tools and proximity calculation] | ::[http://petrowiki.org/Category:1.9.5_Ranging_tools_and_proximity_calculation 1.9.5 Ranging tools and proximity calculation] | ||
Line 121: | Line 121: | ||
:[http://petrowiki.org/Category:1.10_Drilling_equipment 1.10 Drilling equipment] | :[http://petrowiki.org/Category:1.10_Drilling_equipment 1.10 Drilling equipment] | ||
::[http://petrowiki.org/Category:1.10.1_Drill_string_components_and_drilling_tools 1.10.1 Drill string components and drilling tools ] (tubulars, jars, subs, stabilisers, reamers, etc) | ::[http://petrowiki.org/Category:1.10.1_Drill_string_components_and_drilling_tools 1.10.1 Drill string components and drilling tools] (tubulars, jars, subs, stabilisers, reamers, etc) | ||
::[http://petrowiki.org/Category:1.10.2_Directional_drilling_systems_and_equipment 1.10.2 Directional drilling systems and equipment] | ::[http://petrowiki.org/Category:1.10.2_Directional_drilling_systems_and_equipment 1.10.2 Directional drilling systems and equipment] | ||
Line 135: | Line 135: | ||
::[http://petrowiki.org/Category:1.11.1_Fluid_mechanics_for_drilling 1.11.1 Fluid mechanics for drilling] | ::[http://petrowiki.org/Category:1.11.1_Fluid_mechanics_for_drilling 1.11.1 Fluid mechanics for drilling] | ||
::[http://petrowiki.org/Category:1.11.2_Drilling_fluid_selection_and_formulation 1.11.2 Drilling fluid selection and formulation ] (chemistry, properties) | ::[http://petrowiki.org/Category:1.11.2_Drilling_fluid_selection_and_formulation 1.11.2 Drilling fluid selection and formulation] (chemistry, properties) | ||
::[http://petrowiki.org/Category:1.11.3_Drilling_fluid_management_and_disposal 1.11.3 Drilling fluid management and disposal] | ::[http://petrowiki.org/Category:1.11.3_Drilling_fluid_management_and_disposal 1.11.3 Drilling fluid management and disposal] | ||
Line 143: | Line 143: | ||
::[http://petrowiki.org/Category:1.11.5_Drilling_hydraulics 1.11.5 Drilling hydraulics] | ::[http://petrowiki.org/Category:1.11.5_Drilling_hydraulics 1.11.5 Drilling hydraulics] | ||
::[http://petrowiki.org/Category:1.11. | ::[http://petrowiki.org/Category:1.11.6_HPHT_hydraulics 1.11.6 HPHT hydraulics] | ||
::[http://petrowiki.org/Category:1.11.7_Cuttings_transport 1.11.7 Cuttings transport] | ::[http://petrowiki.org/Category:1.11.7_Cuttings_transport 1.11.7 Cuttings transport] | ||
Line 151: | Line 151: | ||
'''[[#Top|Back to top]]''' | '''[[#Top|Back to top]]''' | ||
:[http://petrowiki.org/Category:1.12_Drilling_measurement, | :[http://petrowiki.org/Category:1.12_Drilling_measurement,__data_acquisition_and,_automation 1.12 Drilling measurement, data acquisition, and automation] | ||
::[http://petrowiki.org/Category:1.12.1_Measurement_while_drilling 1.12.1 Measurement while drilling] | ::[http://petrowiki.org/Category:1.12.1_Measurement_while_drilling 1.12.1 Measurement while drilling] | ||
Line 157: | Line 157: | ||
::[http://petrowiki.org/Category:1.12.2_Logging_while_drilling 1.12.2 Logging while drilling] | ::[http://petrowiki.org/Category:1.12.2_Logging_while_drilling 1.12.2 Logging while drilling] | ||
::[http://petrowiki.org/Category:1.12. | ::[http://petrowiki.org/Category:1.12.3_Mud_logging__and_surface_measurements 1.12.3 Mud logging and surface measurements] | ||
::[http://petrowiki.org/Category:1.12. | ::[http://petrowiki.org/Category:1.12.4_Sensor_technology 1.12.4 Sensor Technology] | ||
::[http://petrowiki.org/Category:1.12. | ::[http://petrowiki.org/Category:1.12.5_Real_time_data_transmission 1.12.5 Real time data transmission] | ||
:[http://petrowiki.org/Category:1. | ::[http://petrowiki.org/Category:1.12.6_Drilling_data_management_and_standards 1.12.6 Drilling data management and standards] | ||
:[http://petrowiki.org/Category:1.13_Drilling_automation 1.13 Drilling automation] | |||
::[http://petrowiki.org/Category:1.13. | ::[http://petrowiki.org/Category:1.13.1_Surface_operations_automation 1.13.1 Surface operations automation] | ||
::[http://petrowiki.org/Category:1.13. | ::[http://petrowiki.org/Category:1.13.2_Downhole_operations_automation 1.13.2 Downhole operations automation] | ||
::[http://petrowiki.org/Category:1.13. | ::[http://petrowiki.org/Category:1.13.3_Autonomous_downhole_tools 1.13.3 Autonomous downhole tools] | ||
:[http://petrowiki.org/Category:1. | :[http://petrowiki.org/Category:1.14_Casing_and_cementing 1.14 Casing and cementing] | ||
::[http://petrowiki.org/Category:1.14.1_Casing_design 1.14.1 Casing design] | |||
::[http://petrowiki.org/Category:1.14.2_Casing_material_selection 1.14.2 Casing material selection] | |||
::[http://petrowiki.org/Category:1.14.3_Cement_formulation 1.14.3 Cement formulation] (chemistry, properties) | |||
::[http://petrowiki.org/Category:1.14.4_Cement_and_bond_evaluation 1.14.4 Cement and bond evaluation] | |||
:[http://petrowiki.org/Category:1.15_Fundamental_research_in_drilling 1.15 Fundamental research in drilling] | |||
'''[[#Top|Back to top]]''' | '''[[#Top|Back to top]]''' | ||
== | ==Completions== | ||
;[http://petrowiki.org/Category:2_Completions 2 Completions] | |||
:[http://petrowiki.org/Category:2.1_Completion_selection_and_design 2.1 Completion selection and design] | |||
:[http://petrowiki.org/Category:2. | ::[http://petrowiki.org/Category:2.1.1_Completion_selection 2.1.1 Completion selection] | ||
::[http://petrowiki.org/Category:2.1. | ::[http://petrowiki.org/Category:2.1.2_Production_tubing_design 2.1.2 Production tubing design] | ||
::[http://petrowiki.org/Category:2.1. | ::[http://petrowiki.org/Category:2.1.3_Completion_equipment 2.1.3 Completion equipment] | ||
::[http://petrowiki.org/Category:2.1. | ::[http://petrowiki.org/Category:2.1.4_Completion_load_modelling 2.1.4 Completion load modelling] | ||
::[http://petrowiki.org/Category:2.1. | ::[http://petrowiki.org/Category:2.1.5_Completion_materials 2.1.5 Completion materials] | ||
::[http://petrowiki.org/Category:2.1. | ::[http://petrowiki.org/Category:2.1.6_HPHT_completions_design 2.1.6 HPHT completions design] | ||
::[http://petrowiki.org/Category:2.1. | ::[http://petrowiki.org/Category:2.1.7_Deepwater_completions_design 2.1.7 Deepwater completions design] | ||
:[http://petrowiki.org/Category:2.2_Completion_installation_and_operations 2.2 Completion installation and operations] | |||
:[http://petrowiki.org/Category:2. | ::[http://petrowiki.org/Category:2.2.1_Well_clean_out 2.2.1 Well clean out] | ||
::[http://petrowiki.org/Category:2.2. | ::[http://petrowiki.org/Category:2.2.2_Perforating 2.2.2 Perforating] | ||
::[http://petrowiki.org/Category:2.2. | ::[http://petrowiki.org/Category:2.2.3_Fluid_loss_control 2.2.3 Fluid loss control] | ||
::[http://petrowiki.org/Category:2.2.4_HPHT_completions_installation 2.2.4 HPHT completions installation] | |||
::[http://petrowiki.org/Category:2.2.5_Deepwater_completions_installation 2.2.5 Deepwater completions installation] | |||
::[http://petrowiki.org/Category:2.2.6_Coiled_tubing_operations 2.2.6 Coiled tubing operations] | |||
'''[[#Top|Back to top]]''' | '''[[#Top|Back to top]]''' | ||
:[http://petrowiki.org/Category:2. | :[http://petrowiki.org/Category:2.3_Completion_monitoring_systems_/_intelligent_wells 2.3 Completion monitoring systems/intelligent wells] | ||
::[http://petrowiki.org/Category:2.3.1_Remote_monitoring 2.3.1 Remote monitoring] | ::[http://petrowiki.org/Category:2.3.1_Remote_monitoring 2.3.1 Remote monitoring] | ||
Line 211: | Line 229: | ||
::[http://petrowiki.org/Category:2.3.2_Downhole_sensors_and_control_equipment 2.3.2 Downhole sensors and control equipment] | ::[http://petrowiki.org/Category:2.3.2_Downhole_sensors_and_control_equipment 2.3.2 Downhole sensors and control equipment] | ||
::[http://petrowiki.org/Category:2.3. | ::[http://petrowiki.org/Category:2.3.3_Flow_control_equipment 2.3.3 Flow control equipment] | ||
::[http://petrowiki.org/Category:2.3.4_Real_time_optimization 2.3.4 Real time optimization] | ::[http://petrowiki.org/Category:2.3.4_Real_time_optimization 2.3.4 Real time optimization] | ||
Line 217: | Line 235: | ||
::[http://petrowiki.org/Category:2.3.5_Completion_data_management 2.3.5 Completion data management] | ::[http://petrowiki.org/Category:2.3.5_Completion_data_management 2.3.5 Completion data management] | ||
:[http://petrowiki.org/Category:2. | ::[http://petrowiki.org/Category:2.3.6_Tubular_optimization 2.3.6 Tubular optimization] | ||
::[http://petrowiki.org/Category:2.3.7_Downhole_tools_and_equipment 2.3.7 Downhole tools and equipment] | |||
:[http://petrowiki.org/Category:2.4_Sand_control 2.4 Sand control] | |||
::[http://petrowiki.org/Category:2.4. | ::[http://petrowiki.org/Category:2.4.3_Sand_/_solids_control 2.4.1 Sand/solids control] | ||
::[http://petrowiki.org/Category:2.4. | ::[http://petrowiki.org/Category:2.4.4_Screen_Selection 2.4.4 Screen selection] | ||
:[http://petrowiki.org/Category:2.5_Hydraulic_fracturing 2.5 Hydraulic fracturing ] | ::[http://petrowiki.org/Category:2.4.5_Gravel_pack_design_&_evaluation 2.4.5 Gravel pack design & evaluation] | ||
::[http://petrowiki.org/Category:2.4.6_Frac_and_pack 2.4.6 Frac and pack] | |||
:[http://petrowiki.org/Category:2.5_Hydraulic_fracturing 2.5 Hydraulic fracturing] | |||
::[http://petrowiki.org/Category:2.5.1_Fracture_design_and_containment 2.5.1 Fracture design and containment] | ::[http://petrowiki.org/Category:2.5.1_Fracture_design_and_containment 2.5.1 Fracture design and containment] | ||
::[http://petrowiki.org/Category:2.5.2_Fracturing_materials 2.5.2 Fracturing materials] | ::[http://petrowiki.org/Category:2.5.2_Fracturing_materials 2.5.2 Fracturing materials] (fluids, proppant) | ||
::[http://petrowiki.org/Category:2.5.3_Fracturing_equipment 2.5.3 Fracturing equipment] | ::[http://petrowiki.org/Category:2.5.3_Fracturing_equipment 2.5.3 Fracturing equipment] | ||
Line 233: | Line 259: | ||
::[http://petrowiki.org/Category:2.5.4_Multistage_fracturing 2.5.4 Multistage fracturing] | ::[http://petrowiki.org/Category:2.5.4_Multistage_fracturing 2.5.4 Multistage fracturing] | ||
:[http://petrowiki.org/Category:2. | ::[http://petrowiki.org/Category:2.5.5_Re-fracturing 2.5.5 Re-fracturing] | ||
:[http://petrowiki.org/Category:2.6_Acidizing 2.6 Acidizing] | |||
:[http://petrowiki.org/Category:2.7_Completion_fluids 2.7 Completion fluids] | |||
::[http://petrowiki.org/Category:2.7.1_Completion_fluids 2.7.1 Completion fluids] | |||
::[http://petrowiki.org/Category:2.7.2_Formation_damage_during_completion 2.7.2 Formation damage during completion] | |||
:[http://petrowiki.org/Category:2.8_Completions_evaluation 2.8 Completions evaluation] | |||
:[http://petrowiki.org/Category:2.9_Recompletion 2.9 Recompletion] | |||
:[http://petrowiki.org/Category:2.10_Well_Integrity 2.10 Well Integrity] | |||
::[http://petrowiki.org/Category:2.10.1_Design_for_well_integrity 2.10.1 Design for well integrity] | |||
::[http://petrowiki.org/Category:2.10.2_Well_integrity_logging_and_monitoring 2.10.2 Well integrity logging and monitoring] | |||
::[http://petrowiki.org/Category:2.10.3_Zonal_isolation 2.10.3 Zonal isolation] | |||
::[http://petrowiki.org/Category:2.10.4_Subsurface_corrosion 2.10.4 Subsurface corrosion (tubing, casing, completion equipment, conductor)] | |||
:[http://petrowiki.org/Category:2.11_Fundamental_research_in_well_completion 2.10 Fundamental research in well completion] | |||
'''[[#Top|Back to top]]''' | '''[[#Top|Back to top]]''' | ||
==Production and | ==Production and operations== | ||
:[http://petrowiki.org/Category: | :[http://petrowiki.org/Category:3_Production_and_operations 3 Production and well operations] | ||
::[http://petrowiki.org/Category:3.1__Artificial_lift_systems 3.1 | ::[http://petrowiki.org/Category:3.1__Artificial_lift_systems 3.1 Artificial lift systems] | ||
::[http://petrowiki.org/Category:3.1.1_Beam_and_related_pumping_techniques 3.1.1 Beam and related pumping techniques ] | ::[http://petrowiki.org/Category:3.1.1_Beam_and_related_pumping_techniques 3.1.1 Beam and related pumping techniques] | ||
::[http://petrowiki.org/Category:3.1.2_Electric_submersible_pumps 3.1.2 Electric submersible pumps | ::[http://petrowiki.org/Category:3.1.2_Electric_submersible_pumps 3.1.2 Electric submersible pumps] | ||
::[http://petrowiki.org/Category:3.1.3_Hydraulic_and_jet_pumps 3.1.3 Hydraulic and jet pumps | ::[http://petrowiki.org/Category:3.1.3_Hydraulic_and_jet_pumps 3.1.3 Hydraulic and jet pumps] | ||
::[http://petrowiki.org/Category:3.1.4_Hybrid_lift_technologies 3.1.4 Hybrid lift technologies] | ::[http://petrowiki.org/Category:3.1.4_Hybrid_lift_technologies 3.1.4 Hybrid lift technologies] | ||
::[http://petrowiki.org/Category:3.1.5_Plunger_lift 3.1.5 Plunger lift | ::[http://petrowiki.org/Category:3.1.5_Plunger_lift 3.1.5 Plunger lift] | ||
::[http://petrowiki.org/Category:3.1.6_Gas_lift 3.1.6 Gas lift | ::[http://petrowiki.org/Category:3.1.6_Gas_lift 3.1.6 Gas lift] | ||
::[http://petrowiki.org/Category:3.1.7_Progressing_cavity_pumps 3.1.7 Progressing cavity pumps] | ::[http://petrowiki.org/Category:3.1.7_Progressing_cavity_pumps 3.1.7 Progressing cavity pumps] | ||
Line 259: | Line 309: | ||
::[http://petrowiki.org/Category:3.1.8_Gas_well_deliquification 3.1.8 Gas well deliquification] | ::[http://petrowiki.org/Category:3.1.8_Gas_well_deliquification 3.1.8 Gas well deliquification] | ||
:[http://petrowiki.org/Category:3. | :[http://petrowiki.org/Category:3.2_Well_operations_and_optimization 3.2 Well operations and optimization] | ||
::[http://petrowiki.org/Category:3.2. | ::[http://petrowiki.org/Category:3.2.1_Well_candidate_recognition 3.2.1 Well candidate recognition] | ||
::[http://petrowiki.org/Category:3.2. | ::[http://petrowiki.org/Category:3.2.2_Downhole_intervention_and_remediation_(including_wireline_and_coiled_tubing) 3.2.2 Downhole intervention and remediation] (including wireline and coiled tubing) | ||
::[http://petrowiki.org/Category:3.2. | ::[http://petrowiki.org/Category:3.2.3_Produced_sand/_solids_management_and_control 3.2.3 Produced sand/solids management and control] | ||
::[http://petrowiki.org/Category:3.2. | ::[http://petrowiki.org/Category:3.2.4_Produced_water_management_and_control 3.2.4 Produced water management and control] | ||
::[http://petrowiki.org/Category:3.2. | ::[http://petrowiki.org/Category:3.2.5_Downhole_fluids_separation,_management_and_disposal 3.2.5 Downhole fluids separation management and disposal] | ||
::[http://petrowiki.org/Category:3.2. | ::[http://petrowiki.org/Category:3.2.6_Well_performance_modeling 3.2.6 Well performance modeling] | ||
::[http://petrowiki.org/Category:3.2. | ::[http://petrowiki.org/Category:3.2.7_Lifecycle_management_and_planning 3.2.7 Lifecycle management and planning] | ||
'''[[#Top|Back to top]]''' | '''[[#Top|Back to top]]''' | ||
:[http://petrowiki.org/Category:3.3_Well_and_reservoir_surveillance_and_monitoring 3.3 Well and reservoir surveillance and monitoring ] | :[http://petrowiki.org/Category:3.3_Well_and_reservoir_surveillance_and_monitoring 3.3 Well and reservoir surveillance and monitoring] | ||
::[http://petrowiki.org/Category:3.3.1_Production_logging 3.3.1 Production logging | ::[http://petrowiki.org/Category:3.3.1_Production_logging 3.3.1 Production logging] | ||
::[http://petrowiki.org/Category:3.3.2_Borehole_imaging_and_wellbore_seismic 3.3.2 Borehole imaging and wellbore seismic] | ::[http://petrowiki.org/Category:3.3.2_Borehole_imaging_and_wellbore_seismic 3.3.2 Borehole imaging and wellbore seismic] | ||
Line 293: | Line 339: | ||
::[http://petrowiki.org/Category:3.3.5_Production_data_management 3.3.5 Production data management] | ::[http://petrowiki.org/Category:3.3.5_Production_data_management 3.3.5 Production data management] | ||
::[http://petrowiki.org/Category:3.3.6_Integrated_modeling 3.3.6 Integrated modeling | ::[http://petrowiki.org/Category:3.3.6_Integrated_modeling 3.3.6 Integrated modeling] | ||
:[http://petrowiki.org/Category:3.4_Production_chemistry, | :[http://petrowiki.org/Category:3.4_Production_chemistry,_metallurgy,__and_biology 3.4 Production chemistry, metallurgy, and biology] | ||
::[http://petrowiki.org/Category:3.4.1_Inhibition_and_remediation_of_hydrates,_scale, | ::[http://petrowiki.org/Category:3.4.1_Inhibition_and_remediation_of_hydrates,_scale,_paraffin_or_wax,_and_asphaltene 3.4.1 Inhibition and remediation of hydrates, scale, paraffin or wax, and asphaltene] | ||
::[http://petrowiki.org/Category:3.4.2_Well_fluid_analysis 3.4.2 Well fluid analysis] | ::[http://petrowiki.org/Category:3.4.2_Well_fluid_analysis 3.4.2 Well fluid analysis] | ||
::[http://petrowiki.org/Category:3.4.3_Corrosion_inhibition_and_management 3.4.3 Corrosion inhibition and management ] (including | ::[http://petrowiki.org/Category:3.4.3_Corrosion_inhibition_and_management 3.4.3 Corrosion inhibition and management] (including H2S and CO2) | ||
::[http://petrowiki.org/Category:3.4.4_Downhole_chemical_treatments_and_fluid_compatibility 3.4.4 Downhole chemical treatments and fluid compatibility] | ::[http://petrowiki.org/Category:3.4.4_Downhole_chemical_treatments_and_fluid_compatibility 3.4.4 Downhole chemical treatments and fluid compatibility] | ||
Line 307: | Line 353: | ||
::[http://petrowiki.org/Category:3.4.5_Bacterial_contamination_and_control 3.4.5 Bacterial contamination and control] | ::[http://petrowiki.org/Category:3.4.5_Bacterial_contamination_and_control 3.4.5 Bacterial contamination and control] | ||
:[http://petrowiki.org/Category:3. | :[http://petrowiki.org/Category:3.5_Well_intervention 3.5 Well intervention] | ||
:[http://petrowiki.org/Category:3. | ::[http://petrowiki.org/Category:3.5.1_Candidate_selection 3.5.1 Candidate selection] | ||
::[http://petrowiki.org/Category:3.5.2_Intervention_methods 3.5.2 Intervention methods] | |||
::[http://petrowiki.org/Category:3.5.3_Through_tubing_well_intervention 3.5.3 Through tubing well intervention] | |||
::[http://petrowiki.org/Category:3.5.4_Re-simulation_(excluding_re-fraccing) 3.5.4 Re-simulation (excluding re-fraccing)] | |||
::[http://petrowiki.org/Category:3.5.5_Water_shut-off 3.5.5 Water shut-off] | |||
::[http://petrowiki.org/Category:3.5.6_Pump_repairs 3.5.6 Pump repairs] | |||
:[http://petrowiki.org/Category:3.6_Well_decommissioning 3.6 Well decommissioning] | |||
::[http://petrowiki.org/Category:3.6.1_Well_plug_and_abandonment_methods,_design_and_selection 3.6.1 Well plug and abandonment methods, design and selection] | |||
::[http://petrowiki.org/Category:3.6.2_Plugging_materials 3.6.2 Plugging materials] | |||
::[http://petrowiki.org/Category:3.6.3_Well_plug_and_abandonment_operations 3.6.3 Well plug and abandonment operations] | |||
::[http://petrowiki.org/Category:3.6.4_Rigless_plug_and_abandonment 3.6.4 Rigless plug and abandonment] | |||
:[http://petrowiki.org/Category:3.7_Fundamental_research_in_production_and_operations 3.7 Fundamental research in production and operations] | |||
'''[[#Top|Back to top]]''' | '''[[#Top|Back to top]]''' | ||
== | ==Projects, facilities, and construction== | ||
;[http://petrowiki.org/Category:4_Facilities_design, | ;[http://petrowiki.org/Category:4_Facilities_design,_construction,_and_operation 4 Facilities design, construction, and operation] | ||
:[http://petrowiki.org/Category:4.1_Processing_systems_and_design 4.1 Processing systems and design] | :[http://petrowiki.org/Category:4.1_Processing_systems_and_design 4.1 Processing systems and design] | ||
Line 345: | Line 413: | ||
'''[[#Top|Back to top]]''' | '''[[#Top|Back to top]]''' | ||
:[http://petrowiki.org/Category:4.2_Pipelines, | :[http://petrowiki.org/Category:4.2_Pipelines,_flowlines,_and_risers 4.2 Pipelines, flowlines, and risers] | ||
::[http://petrowiki.org/Category:4.2.1_Piping_design_and_simulation 4.2.1 Piping design and simulation] | ::[http://petrowiki.org/Category:4.2.1_Piping_design_and_simulation 4.2.1 Piping design and simulation] | ||
Line 361: | Line 429: | ||
::[http://petrowiki.org/Category:4.3.1_Hydrates 4.3.1 Hydrates] | ::[http://petrowiki.org/Category:4.3.1_Hydrates 4.3.1 Hydrates] | ||
::[http://petrowiki.org/Category:4.3.2_Precipitates 4.3.2 Precipitates ] (paraffin, asphaltenes, etc.) | ::[http://petrowiki.org/Category:4.3.2_Precipitates 4.3.2 Precipitates] (paraffin, asphaltenes, etc.) | ||
::[http://petrowiki.org/Category:4.3.3_Solids 4.3.3 Solids ] (scale, sand, etc.) | ::[http://petrowiki.org/Category:4.3.3_Solids 4.3.3 Solids] (scale, sand, etc.) | ||
'''[[#Top|Back to top]]''' | '''[[#Top|Back to top]]''' | ||
Line 417: | Line 485: | ||
:[http://petrowiki.org/Category:4.7_Unconventional_production_facilities 4.7 Unconventional production facilities] | :[http://petrowiki.org/Category:4.7_Unconventional_production_facilities 4.7 Unconventional production facilities] | ||
::[http://petrowiki.org/Category:4.7.1_Oil_sand,_shale, | ::[http://petrowiki.org/Category:4.7.1_Oil_sand,_shale,_or_bitumen 4.7.1 Oil sand, shale, or bitumen] | ||
::[http://petrowiki.org/Category:4.7.2_Co2_capture_and_management 4.7.2 Co2 capture and management] | ::[http://petrowiki.org/Category:4.7.2_Co2_capture_and_management 4.7.2 Co2 capture and management] | ||
Line 457: | Line 525: | ||
::[http://petrowiki.org/Category:4.10.2_Offshore_facility_decommissioning 4.10.2 Offshore facility decommissioning] | ::[http://petrowiki.org/Category:4.10.2_Offshore_facility_decommissioning 4.10.2 Offshore facility decommissioning] | ||
:[http://petrowiki.org/Category:4. | :[http://petrowiki.org/Category:4.11_Fundamental_research_in_projects,_facilities,_and_construction 4.11 Fundamental research in projects, facilities, and construction] | ||
::[http://petrowiki.org/Category:4.11.1_Corrosion_research 4.11.1 Corrosion research] | ::[http://petrowiki.org/Category:4.11.1_Corrosion_research 4.11.1 Corrosion research] | ||
Line 463: | Line 531: | ||
'''[[#Top|Back to top]]''' | '''[[#Top|Back to top]]''' | ||
==Reservoir | ==Reservoir== | ||
;[http://petrowiki.org/Category:5_Reservoir_description_and_dynamics 5 Reservoir description and dynamics | ;[http://petrowiki.org/Category:5_Reservoir_description_and_dynamics 5 Reservoir description and dynamics] | ||
:[http://petrowiki.org/Category:5.1_Reservoir_characterization 5.1 Reservoir characterization ] | :[http://petrowiki.org/Category:5.1_Reservoir_characterization 5.1 Reservoir characterization] | ||
::[http://petrowiki.org/Category:5.1. | ::[http://petrowiki.org/Category:5.1.1%20Exploration,%20development,%20and%20structural%20geology 5.1.1 Exploration, development, and structural geology]<br /> | ||
::[http://petrowiki.org/Category:5.1.2_Faults_and_fracture_characterization 5.1.2 Faults and fracture characterization] | ::[http://petrowiki.org/Category:5.1.2_Faults_and_fracture_characterization 5.1.2 Faults and fracture characterization] | ||
Line 495: | Line 563: | ||
::[http://petrowiki.org/Category:5.2.1_Phase_behavior_and_pvt_measurements 5.2.1 Phase behavior and pvt measurements] | ::[http://petrowiki.org/Category:5.2.1_Phase_behavior_and_pvt_measurements 5.2.1 Phase behavior and pvt measurements] | ||
::[http://petrowiki.org/Category:5.2.2_Fluid_modeling,_equations_of_state 5.2.2 Fluid modeling, equations of state ] | ::[http://petrowiki.org/Category:5.2.2_Fluid_modeling,_equations_of_state 5.2.2 Fluid modeling, equations of state] | ||
::[http://petrowiki.org/Category:5.2.3_Geochemical_characterization 5.2.3 Geochemical characterization] | ::[http://petrowiki.org/Category:5.2.3_Geochemical_characterization 5.2.3 Geochemical characterization] | ||
Line 503: | Line 571: | ||
::[http://petrowiki.org/Category:5.3.1_Flow_in_porous_media 5.3.1 Flow in porous media] | ::[http://petrowiki.org/Category:5.3.1_Flow_in_porous_media 5.3.1 Flow in porous media] | ||
::[http://petrowiki.org/Category:5.3. | ::[http://petrowiki.org/Category:5.3.2_Multiphase_flow 5.3.2 Multiphase flow] | ||
::[http://petrowiki.org/Category:5.3.3_Particle_transportation 5.3.3 Particle transportation] | ::[http://petrowiki.org/Category:5.3.3_Particle_transportation 5.3.3 Particle transportation] | ||
Line 509: | Line 577: | ||
::[http://petrowiki.org/Category:5.3.4_Integration_of_geomechanics_in_models 5.3.4 Integration of geomechanics in models] | ::[http://petrowiki.org/Category:5.3.4_Integration_of_geomechanics_in_models 5.3.4 Integration of geomechanics in models] | ||
:[http://petrowiki.org/Category:5.4_Improved_and_enhanced_recovery 5.4 Improved and enhanced recovery ] | :[http://petrowiki.org/Category:5.4_Improved_and_enhanced_recovery 5.4 Improved and enhanced recovery] | ||
::[http://petrowiki.org/Category:5.4.1_Waterflooding 5.4.1 Waterflooding] | ::[http://petrowiki.org/Category:5.4.1_Waterflooding 5.4.1 Waterflooding] | ||
Line 521: | Line 589: | ||
::[http://petrowiki.org/Category:5.4.5_Conformance_improvement 5.4.5 Conformance improvement] | ::[http://petrowiki.org/Category:5.4.5_Conformance_improvement 5.4.5 Conformance improvement] | ||
::[http://petrowiki.org/Category:5.4.6_Thermal_methods_ 5.4.6 Thermal methods ] | ::[http://petrowiki.org/Category:5.4.6_Thermal_methods_ 5.4.6 Thermal methods] | ||
::[http://petrowiki.org/Category:5.4.7_Chemical_flooding_methods_ 5.4.7 Chemical flooding methods ] | ::[http://petrowiki.org/Category:5.4.7_Chemical_flooding_methods_ 5.4.7 Chemical flooding methods] | ||
::[http://petrowiki.org/Category:5.4.8_Steam_solvent_combination_methods 5.4.8 Steam solvent combination methods] | ::[http://petrowiki.org/Category:5.4.8_Steam_solvent_combination_methods 5.4.8 Steam solvent combination methods] | ||
Line 531: | Line 599: | ||
::[http://petrowiki.org/Category:5.4.10_Microbial_methods 5.4.10 Microbial methods] | ::[http://petrowiki.org/Category:5.4.10_Microbial_methods 5.4.10 Microbial methods] | ||
::[http://petrowiki.org/Category:5.4.11_Cold_heavy_oil_production 5.4.11 Cold heavy oil production ] | ::[http://petrowiki.org/Category:5.4.11_Cold_heavy_oil_production 5.4.11 Cold heavy oil production] | ||
:[http://petrowiki.org/Category:5.5_Reservoir_simulation_ 5.5 Reservoir simulation ] | :[http://petrowiki.org/Category:5.5_Reservoir_simulation_ 5.5 Reservoir simulation] | ||
::[http://petrowiki.org/Category:5.5.1_Simulator_development 5.5.1 Simulator development] | ::[http://petrowiki.org/Category:5.5.1_Simulator_development 5.5.1 Simulator development] | ||
Line 555: | Line 623: | ||
:[http://petrowiki.org/Category:5.6_Formation_evaluation_and_management 5.6 Formation evaluation and management] | :[http://petrowiki.org/Category:5.6_Formation_evaluation_and_management 5.6 Formation evaluation and management] | ||
::[http://petrowiki.org/Category:5.6. | ::[http://petrowiki.org/Category:5.6.1_Open_hole_or_cased_hole_log_analysis 5.6.1 Open hole or cased hole log analysis] | ||
::[http://petrowiki.org/Category:5.6.2_Core_analysis 5.6.2 Core analysis] | ::[http://petrowiki.org/Category:5.6.2_Core_analysis 5.6.2 Core analysis] | ||
Line 561: | Line 629: | ||
::[http://petrowiki.org/Category:5.6.3_Pressure_transient_analysis 5.6.3 Pressure transient analysis] | ::[http://petrowiki.org/Category:5.6.3_Pressure_transient_analysis 5.6.3 Pressure transient analysis] | ||
::[http://petrowiki.org/Category:5.6. | ::[http://petrowiki.org/Category:5.6.4_Drillstem_or_well_testing 5.6.4 Drillstem or well testing] | ||
::[http://petrowiki.org/Category:5.6.5_Tracer_test_analysis 5.6.5 Tracer test analysis] | ::[http://petrowiki.org/Category:5.6.5_Tracer_test_analysis 5.6.5 Tracer test analysis] | ||
Line 567: | Line 635: | ||
::[http://petrowiki.org/Category:5.6.6_Cross_well_tomography 5.6.6 Cross well tomography] | ::[http://petrowiki.org/Category:5.6.6_Cross_well_tomography 5.6.6 Cross well tomography] | ||
::[http://petrowiki.org/Category:5.6.7_Formation_test_analysis 5.6.7 Formation test analysis] | ::[http://petrowiki.org/Category:5.6.7_Formation_test_analysis 5.6.7 Formation test analysis] (e.g., wireline, LWD) | ||
::[http://petrowiki.org/Category:5.6. | ::[http://petrowiki.org/Category:5.6.8_Well_performance_monitoring,_inflow_performance 5.6.8 Well performance monitoring, inflow performance] | ||
::[http://petrowiki.org/Category:5.6.9_Production_forecasting 5.6.9 Production forecasting] | ::[http://petrowiki.org/Category:5.6.9_Production_forecasting 5.6.9 Production forecasting] | ||
::[http://petrowiki.org/Category:5.6.10_Seismic__monitoring 5.6.10 Seismic | ::[http://petrowiki.org/Category:5.6.10_Seismic__monitoring 5.6.10 Seismic monitoring] (four dimensional) | ||
::[http://petrowiki.org/Category:5.6.11_Reservoir_monitoring_with_permanent_sensors 5.6.11 Reservoir monitoring with permanent sensors] | ::[http://petrowiki.org/Category:5.6.11_Reservoir_monitoring_with_permanent_sensors 5.6.11 Reservoir monitoring with permanent sensors] | ||
Line 603: | Line 671: | ||
::[http://petrowiki.org/Category:5.8.4_Shale_oil 5.8.4 Shale oil] | ::[http://petrowiki.org/Category:5.8.4_Shale_oil 5.8.4 Shale oil] | ||
::[http://petrowiki.org/Category:5.8.5_Oil_sand,_oil_shale, | ::[http://petrowiki.org/Category:5.8.5_Oil_sand,_oil_shale,_or_bitumen 5.8.5 Oil sand, oil shale, or bitumen] | ||
::[http://petrowiki.org/Category:5.8.6_Naturally_fractured_reservoirs 5.8.6 Naturally fractured reservoirs] | ::[http://petrowiki.org/Category:5.8.6_Naturally_fractured_reservoirs 5.8.6 Naturally fractured reservoirs] | ||
Line 609: | Line 677: | ||
::[http://petrowiki.org/Category:5.8.7_Carbonate_reservoirs 5.8.7 Carbonate reservoirs] | ::[http://petrowiki.org/Category:5.8.7_Carbonate_reservoirs 5.8.7 Carbonate reservoirs] | ||
::[http://petrowiki.org/Category:5.8.8_Gas_condensate__reservoirs 5.8.8 Gas condensate | ::[http://petrowiki.org/Category:5.8.8_Gas_condensate__reservoirs 5.8.8 Gas condensate reservoirs] | ||
::[http://petrowiki.org/Category:5.8. | ::[http://petrowiki.org/Category:5.8.9_Hp/_ht_reservoirs 5.8.9 Hp/ht reservoirs] | ||
:[http://petrowiki.org/Category:5.9_Non_traditional_resources 5.9 Non traditional resources] | :[http://petrowiki.org/Category:5.9_Non_traditional_resources 5.9 Non traditional resources] | ||
Line 621: | Line 689: | ||
:[http://petrowiki.org/Category:5.10_Storage_reservoir_engineering 5.10 Storage reservoir engineering] | :[http://petrowiki.org/Category:5.10_Storage_reservoir_engineering 5.10 Storage reservoir engineering] | ||
::[http://petrowiki.org/Category:5.10. | ::[http://petrowiki.org/Category:5.10.1_CO2_capture_and_sequestration 5.10.1 CO2 capture and sequestration] | ||
::[http://petrowiki.org/Category:5.10.2_Natural_gas_storage 5.10.2 Natural gas storage] | ::[http://petrowiki.org/Category:5.10.2_Natural_gas_storage 5.10.2 Natural gas storage] | ||
Line 629: | Line 697: | ||
'''[[#Top|Back to top]]''' | '''[[#Top|Back to top]]''' | ||
==Health, safety, | ==Health, safety, environment, and sustainability== | ||
;[http://petrowiki.org/Category:6_Health,_safety,_security, | ;[http://petrowiki.org/Category:6_Health,_safety,_security,_environment,__and_social_responsibility 6 Health, safety, environment, and sustainability] | ||
:[http://petrowiki.org/Category:6. | :[http://petrowiki.org/Category:6.1_HSSE_and_management 6.1 HSES and management] | ||
::[http://petrowiki.org/Category:6.1.1_HSSE_management_systems 6.1.1 | ::[http://petrowiki.org/Category:6.1.1_HSSE_management_systems 6.1.1 HSES management systems] | ||
::[http://petrowiki.org/Category:6.1.2_Hsse_reporting 6.1.2 | ::[http://petrowiki.org/Category:6.1.2_Hsse_reporting 6.1.2 HSES reporting] | ||
::[http://petrowiki.org/Category:6.1.3_HSSE_audit_and_certification 6.1.3 | ::[http://petrowiki.org/Category:6.1.3_HSSE_audit_and_certification 6.1.3 HSES audit and certification] | ||
::[http://petrowiki.org/Category:6.1.4_HSSE_standards, | ::[http://petrowiki.org/Category:6.1.4_HSSE_standards,_regulations,_and_codes 6.1.4 HSES standards, regulations, and codes] | ||
::[http://petrowiki.org/Category:6.1.5_Human_resources, | ::[http://petrowiki.org/Category:6.1.5_Human_resources,_competence,_and_training 6.1.5 Human resources, competence, and training] | ||
::[http://petrowiki.org/Category:6.1.6_Contingency_planning_and_emergency_response 6.1.6 Contingency planning and emergency response] | ::[http://petrowiki.org/Category:6.1.6_Contingency_planning_and_emergency_response 6.1.6 Contingency planning and emergency response] | ||
Line 657: | Line 725: | ||
::[http://petrowiki.org/Category:6.2.4_Industrial_hygiene 6.2.4 Industrial hygiene] | ::[http://petrowiki.org/Category:6.2.4_Industrial_hygiene 6.2.4 Industrial hygiene] | ||
::[http://petrowiki.org/Category:6.2.5_Community_health_outreach 6.2.5 Community health outreach ] | ::[http://petrowiki.org/Category:6.2.5_Community_health_outreach 6.2.5 Community health outreach] | ||
::[http://petrowiki.org/Category:6.2.6_Infectious_diseases 6.2.6 Infectious diseases ] (HIV/AIDS, malaria, tuberculosis) | ::[http://petrowiki.org/Category:6.2.6_Infectious_diseases 6.2.6 Infectious diseases] (HIV/AIDS, malaria, tuberculosis) | ||
::[http://petrowiki.org/Category:6.2.7_Noise,_chemicals,_and_other_workplace_hazards 6.2.7 Noise, chemicals, and other workplace hazards] | ::[http://petrowiki.org/Category:6.2.7_Noise,_chemicals,_and_other_workplace_hazards 6.2.7 Noise, chemicals, and other workplace hazards] | ||
Line 669: | Line 737: | ||
:[http://petrowiki.org/Category:6.3_Safety 6.3 Safety] | :[http://petrowiki.org/Category:6.3_Safety 6.3 Safety] | ||
::[http://petrowiki.org/Category:6.3.1_Human_factors_ 6.3.1 Human factors ] (engineering and behavioral aspects) | ::[http://petrowiki.org/Category:6.3.1_Human_factors_ 6.3.1 Human factors] (engineering and behavioral aspects) | ||
::[http://petrowiki.org/Category:6.3.2_Safety_in_design_and_engineering 6.3.2 Safety in design and engineering] | ::[http://petrowiki.org/Category:6.3.2_Safety_in_design_and_engineering 6.3.2 Safety in design and engineering] | ||
Line 709: | Line 777: | ||
::[http://petrowiki.org/Category:6.5.7_Climate_change 6.5.7 Climate change] | ::[http://petrowiki.org/Category:6.5.7_Climate_change 6.5.7 Climate change] | ||
:[http://petrowiki.org/Category:6. | :[http://petrowiki.org/Category:6.6_Sustainability/_social_responsibility 6.6 Sustainability/social responsibility] | ||
::[http://petrowiki.org/Category:6.6. | ::[http://petrowiki.org/Category:6.6.1_Integrating_HSES_into_the_business 6.6.1 Integrating HSES into the business] | ||
::[http://petrowiki.org/Category:6.6.2_Environmental_and_social_impact_assessments 6.6.2 Environmental and social impact assessments] | ::[http://petrowiki.org/Category:6.6.2_Environmental_and_social_impact_assessments 6.6.2 Environmental and social impact assessments] | ||
Line 723: | Line 791: | ||
::[http://petrowiki.org/Category:6.6.6_Partnership_and_communication 6.6.6 Partnership and communication] | ::[http://petrowiki.org/Category:6.6.6_Partnership_and_communication 6.6.6 Partnership and communication] | ||
:[http://petrowiki.org/Category:6. | :[http://petrowiki.org/Category:6.7_Fundamental_research_in_HSES 6.7 Fundamental research in HSES] | ||
'''[[#Top|Back to top]]''' | '''[[#Top|Back to top]]''' | ||
==Management | ==Management== | ||
;[http://petrowiki.org/Category:7_Management_and_information 7 Management | ;[http://petrowiki.org/Category:7_Management_and_information 7 Management] | ||
:[http://petrowiki.org/Category:7.1_Asset_and_portfolio_management 7.1 Asset and portfolio management] | :[http://petrowiki.org/Category:7.1_Asset_and_portfolio_management 7.1 Asset and portfolio management] | ||
::[http://petrowiki.org/Category:7.1.1_Reserves_replacement, | ::[http://petrowiki.org/Category:7.1.1_Reserves_replacement,_booking,_and_auditing 7.1.1 Reserves replacement, booking, and auditing] | ||
::[http://petrowiki.org/Category:7.1.2_Reserves_accounting_for_non_traditional_reservoirs 7.1.2 Reserves accounting for non traditional reservoirs] | ::[http://petrowiki.org/Category:7.1.2_Reserves_accounting_for_non_traditional_reservoirs 7.1.2 Reserves accounting for non traditional reservoirs] | ||
Line 741: | Line 809: | ||
::[http://petrowiki.org/Category:7.1.4_Acquisition_and_divestiture 7.1.4 Acquisition and divestiture] | ::[http://petrowiki.org/Category:7.1.4_Acquisition_and_divestiture 7.1.4 Acquisition and divestiture] | ||
::[http://petrowiki.org/Category:7.1.5_Portfolio_analysis, | ::[http://petrowiki.org/Category:7.1.5_Portfolio_analysis,_management,_and_optimization 7.1.5 Portfolio analysis, management, and optimization] | ||
::[http://petrowiki.org/Category:7.1.6_Field_development_optimization_and_planning 7.1.6 Field development optimization and planning] | ::[http://petrowiki.org/Category:7.1.6_Field_development_optimization_and_planning 7.1.6 Field development optimization and planning] | ||
Line 749: | Line 817: | ||
::[http://petrowiki.org/Category:7.1.8_Asset_integrity 7.1.8 Asset integrity] | ::[http://petrowiki.org/Category:7.1.8_Asset_integrity 7.1.8 Asset integrity] | ||
::[http://petrowiki.org/Category:7.1. | ::[http://petrowiki.org/Category:7.1.9_Project_economics/_valuation 7.1.9 Project economics/ valuation] | ||
::[http://petrowiki.org/Category:7.1.10_Capital_budgeting_and_project_selection 7.1.10 Capital budgeting and project selection] | ::[http://petrowiki.org/Category:7.1.10_Capital_budgeting_and_project_selection 7.1.10 Capital budgeting and project selection] | ||
Line 773: | Line 841: | ||
::[http://petrowiki.org/Category:7.3.2_Benchmarking_and_performance_indicators 7.3.2 Benchmarking and performance indicators] | ::[http://petrowiki.org/Category:7.3.2_Benchmarking_and_performance_indicators 7.3.2 Benchmarking and performance indicators] | ||
::[http://petrowiki.org/Category:7.3.3_Project_management 7.3.3 Project management ] | ::[http://petrowiki.org/Category:7.3.3_Project_management 7.3.3 Project management] | ||
'''[[#Top|Back to top]]''' | '''[[#Top|Back to top]]''' | ||
Line 789: | Line 857: | ||
::[http://petrowiki.org/Category:7.4.5_Future_of_energy,_oil_and_gas 7.4.5 Future of energy, oil and gas] | ::[http://petrowiki.org/Category:7.4.5_Future_of_energy,_oil_and_gas 7.4.5 Future of energy, oil and gas] | ||
::[http://petrowiki.org/Category:7.4.6_Statistical_techniques_for_energy_economics 7.4.6 Statistical techniques for energy economics ] | ::[http://petrowiki.org/Category:7.4.6_Statistical_techniques_for_energy_economics 7.4.6 Statistical techniques for energy economics] | ||
:[http://petrowiki.org/Category:7.5_Professionalism,_training,_and_education 7.5 Professionalism, training, and education] | :[http://petrowiki.org/Category:7.5_Professionalism,_training,_and_education 7.5 Professionalism, training, and education] | ||
Line 805: | Line 873: | ||
'''[[#Top|Back to top]]''' | '''[[#Top|Back to top]]''' | ||
:[http://petrowiki.org/Category: | ==Data science and engineering analytics== | ||
'''[[:Category:8 Information management and systems|8 Data science and engineering analytics]]''' | |||
:[http://petrowiki.org/Category:8.1_Information_management_and_systems 8.1 Information management and systems] | |||
::[http://petrowiki.org/Category: | ::[http://petrowiki.org/Category:8.1.1_Knowledge_management 8.1.1 Knowledge management] | ||
::[http://petrowiki.org/Category: | ::[http://petrowiki.org/Category:8.1.2_Data_integration 8.1.2 Data integration] | ||
::[http://petrowiki.org/Category: | ::[http://petrowiki.org/Category:8.1.3_Data_security 8.1.3 Data security] | ||
::[http://petrowiki.org/Category: | ::[http://petrowiki.org/Category:8.1.4_Data_mining 8.1.4 Data mining] | ||
::[http://petrowiki.org/Category: | ::[http://petrowiki.org/Category:8.1.5_Metadata_management 8.1.5 Metadata management] | ||
::[http://petrowiki.org/Category: | ::[http://petrowiki.org/Category:8.1.6_Artificial_intelligence 8.1.6 Artificial intelligence] | ||
::[http://petrowiki.org/Category: | ::[http://petrowiki.org/Category:8.1.7_Neural_networks 8.1.7 Neural networks] | ||
:[http://petrowiki.org/Category: | :[http://petrowiki.org/Category:8.2_Research_and_development_and_emerging_technnology_programs 8.2 Research and development and emerging technology programs] | ||
::[http://petrowiki.org/Category: | ::[http://petrowiki.org/Category:8.2.1_New_technology_deployment 8.2.1 New technology deployment] | ||
::[http://petrowiki.org/Category: | ::[http://petrowiki.org/Category:8.2.2_New_technology_valuation 8.2.2 New technology valuation] | ||
::[http://petrowiki.org/Category: | ::[http://petrowiki.org/Category:8.2.3_New_technology_funding 8.2.3 New technology funding] | ||
'''[[#Top|Back to top]]''' | '''[[#Top|Back to top]]''' |
Revision as of 08:10, 31 March 2021
Drilling
- 1.10.1 Drill string components and drilling tools (tubulars, jars, subs, stabilisers, reamers, etc)
- 1.11.2 Drilling fluid selection and formulation (chemistry, properties)
- 1.14.3 Cement formulation (chemistry, properties)
Completions
- 2.5.2 Fracturing materials (fluids, proppant)
Production and operations
- 3.2.2 Downhole intervention and remediation (including wireline and coiled tubing)
- 3.4.3 Corrosion inhibition and management (including H2S and CO2)
Projects, facilities, and construction
- 4.3.2 Precipitates (paraffin, asphaltenes, etc.)
- 4.3.3 Solids (scale, sand, etc.)
Reservoir
- 5.6.7 Formation test analysis (e.g., wireline, LWD)
- 5.6.10 Seismic monitoring (four dimensional)
Health, safety, environment, and sustainability
- 6.2.6 Infectious diseases (HIV/AIDS, malaria, tuberculosis)
- 6.3.1 Human factors (engineering and behavioral aspects)