You must log in to edit PetroWiki. Help with editing

Content of PetroWiki is intended for personal use only and to supplement, not replace, engineering judgment. SPE disclaims any and all liability for your use of such content. More information


Long pages

Jump to navigation Jump to search

Showing below up to 250 results in range #1 to #250.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)

  1. (hist) ‎PEH:Polymers, Gels, Foams, and Resins ‎[464,164 bytes]
  2. (hist) ‎PEH:Fluid Flow Through Permeable Media ‎[361,623 bytes]
  3. (hist) ‎PEH:Estimation of Primary Reserves of Crude Oil, Natural Gas, and Condensate ‎[294,434 bytes]
  4. (hist) ‎PEH:Gas Lift ‎[293,890 bytes]
  5. (hist) ‎PEH:Reservoir Simulation ‎[287,388 bytes]
  6. (hist) ‎PEH:Petrophysical Applications ‎[272,790 bytes]
  7. (hist) ‎PEH:Progressing Cavity Pumping Systems ‎[260,146 bytes]
  8. (hist) ‎PEH:Risk and Decision Analysis ‎[239,562 bytes]
  9. (hist) ‎PEH:Oil Reservoir Primary Drive Mechanisms ‎[220,538 bytes]
  10. (hist) ‎PEH:Geologically Based, Geostatistical Reservoir Modeling ‎[218,561 bytes]
  11. (hist) ‎PEH:Geomechanics Applied to Drilling Engineering ‎[216,363 bytes]
  12. (hist) ‎PEH:Electrical Submersible Pumps ‎[213,475 bytes]
  13. (hist) ‎PEH:Coalbed Methane ‎[210,967 bytes]
  14. (hist) ‎PEH:Sucker-Rod Lift ‎[209,861 bytes]
  15. (hist) ‎PEH:Rock Properties ‎[208,185 bytes]
  16. (hist) ‎PEH:Nuclear Magnetic Resonance Applications in Petrophysics and Formation Evaluation ‎[205,485 bytes]
  17. (hist) ‎PEH:Cementing ‎[203,326 bytes]
  18. (hist) ‎PEH:Acoustic Logging ‎[201,711 bytes]
  19. (hist) ‎PEH:Resistivity and SP Logging ‎[190,279 bytes]
  20. (hist) ‎PEH:Geothermal Engineering ‎[189,468 bytes]
  21. (hist) ‎PEH:Production Logging ‎[180,353 bytes]
  22. (hist) ‎PEH:Mathematics of Transient Analysis ‎[178,432 bytes]
  23. (hist) ‎PEH:Asphaltenes and Waxes ‎[175,477 bytes]
  24. (hist) ‎PEH:Sand Control ‎[174,424 bytes]
  25. (hist) ‎Reserves definitions ‎[173,151 bytes]
  26. (hist) ‎PEH:Emulsion Treating ‎[172,153 bytes]
  27. (hist) ‎PEH:Casing Design ‎[171,330 bytes]
  28. (hist) ‎PEH:Waterflooding ‎[170,290 bytes]
  29. (hist) ‎PEH:Tight Gas Reservoirs ‎[168,484 bytes]
  30. (hist) ‎PEH:Coiled-Tubing Well Intervention and Drilling Operations ‎[167,206 bytes]
  31. (hist) ‎PEH:Cold Heavy-Oil Production With Sand ‎[166,948 bytes]
  32. (hist) ‎PEH:Fluid Mechanics for Drilling ‎[158,027 bytes]
  33. (hist) ‎PEH:Offshore Drilling Units ‎[157,568 bytes]
  34. (hist) ‎PEH:Well Production Problems ‎[157,090 bytes]
  35. (hist) ‎PEH:Water-Treating Facilities in Oil and Gas Operations ‎[155,865 bytes]
  36. (hist) ‎PEH:Miscible Processes ‎[154,225 bytes]
  37. (hist) ‎PEH:Piping and Pipelines ‎[148,922 bytes]
  38. (hist) ‎Petroleum Resources Management System ‎[145,231 bytes]
  39. (hist) ‎PEH:Immiscible Gas Injection in Oil Reservoirs ‎[143,231 bytes]
  40. (hist) ‎PEH:Subsea and Downhole Processing ‎[136,565 bytes]
  41. (hist) ‎PEH:Fluid Sampling ‎[135,807 bytes]
  42. (hist) ‎PEH:Gas Treating and Processing ‎[135,018 bytes]
  43. (hist) ‎PEH:Fundamentals of Geophysics ‎[134,397 bytes]
  44. (hist) ‎PEH:Drilling-Data Acquisition ‎[132,345 bytes]
  45. (hist) ‎PEH:Reservoir Geophysics ‎[132,304 bytes]
  46. (hist) ‎PEH:Introduction to Well Planning ‎[129,208 bytes]
  47. (hist) ‎PEH:Nuclear Logging ‎[128,024 bytes]
  48. (hist) ‎PEH:Gas Reservoirs ‎[124,216 bytes]
  49. (hist) ‎PEH:Relative Permeability and Capillary Pressure ‎[122,465 bytes]
  50. (hist) ‎PEH:Completion Systems ‎[122,206 bytes]
  51. (hist) ‎PEH:Petroleum Economics ‎[119,940 bytes]
  52. (hist) ‎PEH:Thermal Recovery by Steam Injection ‎[119,108 bytes]
  53. (hist) ‎PEH:Plunger Lift ‎[116,115 bytes]
  54. (hist) ‎PEH:Crude Oil Emulsions ‎[115,720 bytes]
  55. (hist) ‎PEH:Single-Phase Permeability ‎[114,752 bytes]
  56. (hist) ‎PEH:Electrical Systems ‎[114,212 bytes]
  57. (hist) ‎PEH:Electromagnetic Heating of Oil ‎[111,975 bytes]
  58. (hist) ‎PEH:Underbalanced Drilling ‎[111,507 bytes]
  59. (hist) ‎PEH:Thermodynamics and Phase Behavior ‎[111,329 bytes]
  60. (hist) ‎PEH:Properties of Produced Water ‎[111,011 bytes]
  61. (hist) ‎PEH:Matrix Acidizing ‎[110,859 bytes]
  62. (hist) ‎PEH:Valuation of Oil and Gas Reserves ‎[106,020 bytes]
  63. (hist) ‎PEH:Introduction to Roller-Cone and Polycrystalline Diamond Drill Bits ‎[106,009 bytes]
  64. (hist) ‎PEH:Compressors ‎[104,883 bytes]
  65. (hist) ‎PEH:Hydraulic Fracturing ‎[103,590 bytes]
  66. (hist) ‎PEH:Oil System Correlations ‎[102,366 bytes]
  67. (hist) ‎PEH:Safety Systems ‎[102,170 bytes]
  68. (hist) ‎PEH:Drilling Fluids ‎[101,387 bytes]
  69. (hist) ‎PEH:Monetizing Stranded Gas ‎[100,233 bytes]
  70. (hist) ‎PEH:Well-To-Well Tracer Tests ‎[99,527 bytes]
  71. (hist) ‎PEH:Inflow and Outflow Performance ‎[99,493 bytes]
  72. (hist) ‎PEH:Specialized Well-Logging Topics ‎[99,267 bytes]
  73. (hist) ‎PEH:Reservoir Pressure and Temperature ‎[99,079 bytes]
  74. (hist) ‎PEH:International Oil and Gas Law ‎[95,135 bytes]
  75. (hist) ‎Water saturation determination ‎[91,143 bytes]
  76. (hist) ‎PEH:Formation Damage ‎[90,618 bytes]
  77. (hist) ‎PEH:Tubing Selection, Design, and Installation ‎[90,466 bytes]
  78. (hist) ‎PEH:Hydraulic Pumping in Oil Wells ‎[88,907 bytes]
  79. (hist) ‎PEH:The Single-Well Chemical Tracer Test - A Method For Measuring Reservoir Fluid Saturations In Situ ‎[87,540 bytes]
  80. (hist) ‎PEH:Offshore and Subsea Facilities ‎[86,953 bytes]
  81. (hist) ‎PEH:Mathematics of Vibrating Systems ‎[86,788 bytes]
  82. (hist) ‎PEH:Artificial Lift Systems ‎[86,658 bytes]
  83. (hist) ‎PEH:In-Situ Combustion ‎[85,994 bytes]
  84. (hist) ‎Gas lift installation design methods ‎[84,291 bytes]
  85. (hist) ‎PEH:Oil and Gas Separators ‎[84,223 bytes]
  86. (hist) ‎PEH:Gas Properties ‎[81,996 bytes]
  87. (hist) ‎PEH:Reservoir Management Programs ‎[81,736 bytes]
  88. (hist) ‎PEH:Pumps ‎[80,426 bytes]
  89. (hist) ‎PEH:Well Control: Procedures and Principles ‎[80,058 bytes]
  90. (hist) ‎PEH:Phase Behavior of H2O Hydrocarbon Systems ‎[79,784 bytes]
  91. (hist) ‎PEH:Perforating ‎[77,952 bytes]
  92. (hist) ‎PEH:Mathematics of Fluid Flow ‎[75,771 bytes]
  93. (hist) ‎Cuttings transport ‎[73,684 bytes]
  94. (hist) ‎Solving unsteady flow problems with Laplace transform and source functions ‎[73,633 bytes]
  95. (hist) ‎CBM case studies ‎[73,100 bytes]
  96. (hist) ‎PEH:Reservoir Geology ‎[73,002 bytes]
  97. (hist) ‎Fluid flow in horizontal wells ‎[72,833 bytes]
  98. (hist) ‎PEH:Directional Drilling ‎[70,718 bytes]
  99. (hist) ‎PEH:Mud Logging ‎[69,989 bytes]
  100. (hist) ‎Thermodynamic models for wax precipitation ‎[68,697 bytes]
  101. (hist) ‎PEH:Drilling Problems and Solutions ‎[68,090 bytes]
  102. (hist) ‎PEH:Intelligent Well Completions ‎[66,707 bytes]
  103. (hist) ‎Fluid flow through permeable media ‎[61,301 bytes]
  104. (hist) ‎Oil demulsification ‎[59,221 bytes]
  105. (hist) ‎PEH:Phase Diagrams ‎[58,618 bytes]
  106. (hist) ‎PEH:Liquid and Gas Measurement ‎[56,116 bytes]
  107. (hist) ‎Thermodynamic models for asphaltene precipitation ‎[54,529 bytes]
  108. (hist) ‎Pipeline design consideration and standards ‎[53,195 bytes]
  109. (hist) ‎Tubing design factors ‎[52,969 bytes]
  110. (hist) ‎Pipelines ‎[50,370 bytes]
  111. (hist) ‎Reservoir simulation ‎[49,826 bytes]
  112. (hist) ‎Removing hydrocarbons from water ‎[49,508 bytes]
  113. (hist) ‎PEH:Oil Storage ‎[48,970 bytes]
  114. (hist) ‎Symbols in alphabetical order ‎[47,823 bytes]
  115. (hist) ‎Phase behavior in reservoir simulation ‎[47,301 bytes]
  116. (hist) ‎Dehydration with glycol ‎[46,594 bytes]
  117. (hist) ‎PEH:Emerging Drilling Technologies ‎[46,505 bytes]
  118. (hist) ‎PEH:Petrophysics ‎[46,470 bytes]
  119. (hist) ‎PEH:Hydrate Emerging Technologies ‎[46,314 bytes]
  120. (hist) ‎Reciprocating compressor ‎[45,694 bytes]
  121. (hist) ‎Fluid friction ‎[45,256 bytes]
  122. (hist) ‎PEH:Introduction to Wellhead Systems ‎[44,717 bytes]
  123. (hist) ‎In-situ combustion ‎[44,196 bytes]
  124. (hist) ‎Geostatistical conditional simulation ‎[43,964 bytes]
  125. (hist) ‎PEH:Prime Movers ‎[43,855 bytes]
  126. (hist) ‎Production forecasting frequently asked questions and examples ‎[43,714 bytes]
  127. (hist) ‎Polymer waterflooding ‎[43,485 bytes]
  128. (hist) ‎Steamflood design ‎[43,358 bytes]
  129. (hist) ‎Taxonomy ‎[43,147 bytes]
  130. (hist) ‎PEH:Project Management of Surface Facilities ‎[42,902 bytes]
  131. (hist) ‎Uncertainty analysis in creating production forecast ‎[42,414 bytes]
  132. (hist) ‎Sucker rods ‎[42,088 bytes]
  133. (hist) ‎Prime mover for sucker-rod pumping unit ‎[41,725 bytes]
  134. (hist) ‎Recommended SI units and conversion factors ‎[41,201 bytes]
  135. (hist) ‎Geothermal reservoir characterization ‎[40,900 bytes]
  136. (hist) ‎Hydraulic fracturing in tight gas reservoirs ‎[40,860 bytes]
  137. (hist) ‎Probabilistic verses deterministic in production forecasting ‎[40,597 bytes]
  138. (hist) ‎Coiled tubing fatigue ‎[39,969 bytes]
  139. (hist) ‎Stability of oil emulsions ‎[39,872 bytes]
  140. (hist) ‎Scale problems in production ‎[39,742 bytes]
  141. (hist) ‎PEH:The 21st Century Energy Mix ‎[39,504 bytes]
  142. (hist) ‎Phase behavior of pure fluids ‎[39,440 bytes]
  143. (hist) ‎Sucker-rod lift ‎[38,828 bytes]
  144. (hist) ‎Cementing hardware ‎[38,775 bytes]
  145. (hist) ‎Perforating design ‎[38,245 bytes]
  146. (hist) ‎Gas in place and recoverable volumes ‎[38,242 bytes]
  147. (hist) ‎Upscaling of grid properties in reservoir simulation ‎[37,975 bytes]
  148. (hist) ‎Induction logging ‎[37,695 bytes]
  149. (hist) ‎Water influx models ‎[37,600 bytes]
  150. (hist) ‎Corrosion problems in production ‎[37,520 bytes]
  151. (hist) ‎PCP system components ‎[37,410 bytes]
  152. (hist) ‎Conformance improvement gel treatment design ‎[37,322 bytes]
  153. (hist) ‎Centrifugal compressor ‎[37,295 bytes]
  154. (hist) ‎Electrical engineering considerations for electromagnetic heating of oil ‎[37,212 bytes]
  155. (hist) ‎Thermal recovery by steam injection ‎[36,966 bytes]
  156. (hist) ‎Petrophysical data sources ‎[36,962 bytes]
  157. (hist) ‎Acoustic logging tools ‎[36,897 bytes]
  158. (hist) ‎Packers ‎[36,848 bytes]
  159. (hist) ‎Fluid sampling ‎[36,732 bytes]
  160. (hist) ‎Well integrity ‎[36,706 bytes]
  161. (hist) ‎Material balance in waterdrive reservoirs ‎[36,632 bytes]
  162. (hist) ‎Water and gas coning ‎[36,126 bytes]
  163. (hist) ‎Gas well performance ‎[36,101 bytes]
  164. (hist) ‎Fluid flow in hydraulically fractured wells ‎[36,082 bytes]
  165. (hist) ‎PEH:Oil and Gas Processing ‎[36,004 bytes]
  166. (hist) ‎Plunger design considerations and selection ‎[35,780 bytes]
  167. (hist) ‎Sour gas sweetening ‎[35,688 bytes]
  168. (hist) ‎Electromagnetic heating of oil ‎[35,673 bytes]
  169. (hist) ‎Gas cap drive reservoirs ‎[35,091 bytes]
  170. (hist) ‎Petrophysical analysis case studies ‎[34,962 bytes]
  171. (hist) ‎Subsea processing technology ‎[34,934 bytes]
  172. (hist) ‎Gas well deliverability ‎[34,921 bytes]
  173. (hist) ‎Kriging and cokriging ‎[34,842 bytes]
  174. (hist) ‎Gamma ray logs ‎[34,833 bytes]
  175. (hist) ‎Electrode resistivity devices ‎[34,787 bytes]
  176. (hist) ‎Sucker-rod pumping units ‎[34,712 bytes]
  177. (hist) ‎Fluid typing with NMR logging ‎[34,663 bytes]
  178. (hist) ‎Gas lift valve mechanics ‎[34,620 bytes]
  179. (hist) ‎ESP design ‎[34,128 bytes]
  180. (hist) ‎Coiled tubing drilling ‎[33,920 bytes]
  181. (hist) ‎Asphaltenes and waxes ‎[33,860 bytes]
  182. (hist) ‎Relative permeability ‎[33,808 bytes]
  183. (hist) ‎Types of gels used for conformance improvement ‎[33,651 bytes]
  184. (hist) ‎Removing solids from water ‎[33,606 bytes]
  185. (hist) ‎Cement bond logs ‎[33,246 bytes]
  186. (hist) ‎Applications of nanotechnology ‎[32,778 bytes]
  187. (hist) ‎Modified isochronal tests for gas wells ‎[32,744 bytes]
  188. (hist) ‎Asphaltene precipitation ‎[32,738 bytes]
  189. (hist) ‎Oil bubblepoint pressure ‎[32,670 bytes]
  190. (hist) ‎Asphaltene deposition and plugging ‎[32,639 bytes]
  191. (hist) ‎Reservoir management ‎[32,470 bytes]
  192. (hist) ‎Statistical concepts in risk analysis ‎[32,434 bytes]
  193. (hist) ‎Look backs and forecast verification ‎[32,270 bytes]
  194. (hist) ‎Streamline simulation ‎[31,584 bytes]
  195. (hist) ‎Flare and vent disposal systems ‎[31,296 bytes]
  196. (hist) ‎Predicting hydrate formation ‎[31,239 bytes]
  197. (hist) ‎Integrated asset modelling in production forecasting ‎[31,124 bytes]
  198. (hist) ‎Tight gas reservoirs ‎[31,105 bytes]
  199. (hist) ‎Foam behavior in porous media ‎[30,935 bytes]
  200. (hist) ‎Reservoir geology ‎[30,877 bytes]
  201. (hist) ‎Seismic profiling ‎[30,770 bytes]
  202. (hist) ‎Emissions from oil and gas production operations ‎[30,754 bytes]
  203. (hist) ‎Intermittent-flow gas lift installation design ‎[30,746 bytes]
  204. (hist) ‎Reservoir simulation applications ‎[30,686 bytes]
  205. (hist) ‎Vibration theory ‎[30,668 bytes]
  206. (hist) ‎Types of decline analysis in production forecasting ‎[30,644 bytes]
  207. (hist) ‎Real gases ‎[30,580 bytes]
  208. (hist) ‎History of offshore drilling units ‎[30,532 bytes]
  209. (hist) ‎Seismic interpretation ‎[30,518 bytes]
  210. (hist) ‎Porosity for resource in place calculations ‎[30,465 bytes]
  211. (hist) ‎Oil emulsions ‎[30,348 bytes]
  212. (hist) ‎Relative permeability models ‎[30,299 bytes]
  213. (hist) ‎Natural gas properties ‎[30,293 bytes]
  214. (hist) ‎Strength of casing and tubing ‎[30,213 bytes]
  215. (hist) ‎Lithology and rock type determination ‎[30,193 bytes]
  216. (hist) ‎CHOPS physical mechanisms ‎[30,192 bytes]
  217. (hist) ‎Recommended methods for safety analysis ‎[30,171 bytes]
  218. (hist) ‎Downhole processing candidate screening ‎[29,920 bytes]
  219. (hist) ‎Surface water treatment for injection ‎[29,784 bytes]
  220. (hist) ‎Plunger lift ‎[29,783 bytes]
  221. (hist) ‎ESP system selection and performance calculations ‎[29,691 bytes]
  222. (hist) ‎Laplace transformation for solving transient flow problems ‎[29,532 bytes]
  223. (hist) ‎Mud logging ‎[29,355 bytes]
  224. (hist) ‎Geothermal exploration ‎[29,257 bytes]
  225. (hist) ‎Use of ESPs in harsh environments ‎[29,021 bytes]
  226. (hist) ‎Fluid mechanics for drilling ‎[28,886 bytes]
  227. (hist) ‎Emulsion treating subsystems ‎[28,878 bytes]
  228. (hist) ‎Well log interpretation ‎[28,755 bytes]
  229. (hist) ‎Measurement of capillary pressure and relative permeability ‎[28,733 bytes]
  230. (hist) ‎Pressure drop evaluation along pipelines ‎[28,554 bytes]
  231. (hist) ‎Downhole sucker-rod pumps ‎[28,156 bytes]
  232. (hist) ‎Fluid flow in naturally fractured reservoirs ‎[28,148 bytes]
  233. (hist) ‎Production forecasting decline curve analysis ‎[28,128 bytes]
  234. (hist) ‎Centrifugal pumps ‎[28,055 bytes]
  235. (hist) ‎Seismic attributes for reservoir studies ‎[28,049 bytes]
  236. (hist) ‎NMR applications ‎[27,987 bytes]
  237. (hist) ‎Nuclear magnetic resonance (NMR) logging ‎[27,911 bytes]
  238. (hist) ‎Production forecasting analog methods ‎[27,869 bytes]
  239. (hist) ‎Well preparation for gravel packing ‎[27,778 bytes]
  240. (hist) ‎NMR petrophysics ‎[27,725 bytes]
  241. (hist) ‎Subsurface stress and pore pressure ‎[27,647 bytes]
  242. (hist) ‎Diagonalizing the permeability tensor ‎[27,619 bytes]
  243. (hist) ‎Roller cone bit design ‎[27,165 bytes]
  244. (hist) ‎Statistical concepts ‎[27,041 bytes]
  245. (hist) ‎High performance computing and reservoir simulation ‎[26,993 bytes]
  246. (hist) ‎Continuous and fullbore spinner flowmeters ‎[26,934 bytes]
  247. (hist) ‎Relief valves and relief systems ‎[26,892 bytes]
  248. (hist) ‎Geothermal drilling and completion ‎[26,612 bytes]
  249. (hist) ‎ESP surface motor controllers ‎[26,583 bytes]
  250. (hist) ‎Determining depth to set casing ‎[26,515 bytes]

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)