You must log in to edit PetroWiki. Help with editing

Content of PetroWiki is intended for personal use only and to supplement, not replace, engineering judgment. SPE disclaims any and all liability for your use of such content. More information


Glossary:Top kill

PetroWiki
Revision as of 15:55, 11 September 2013 by Glenda Smith (Glendasmith) (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

A dynamic kill procedure, used in low pressure wells, good for a short period of time. A typical top kill is to pump 5 bbl of fluid in the tubing, offsetting the tubing pressure as the fluid falls. The well must be monitored for pressure or flow and the pump truck usually stays connected in the event that another fluid pill is necessary.