Evaluating IOR potential with single well chemical tracer test: Difference between revisions

no edit summary
No edit summary
No edit summary
 
Line 14: Line 14:


In every case, the process was evaluated successfully using the [[Single_well_chemical_tracer_test|SWCT]] test. In most of these sequences, the IOR fluid injection and push steps were carried out by the [[Single_well_chemical_tracer_test|SWCT]] test field group as a part of the field test program. A typical single-well pilot evaluation of an IOR process requires four to six weeks to complete.
In every case, the process was evaluated successfully using the [[Single_well_chemical_tracer_test|SWCT]] test. In most of these sequences, the IOR fluid injection and push steps were carried out by the [[Single_well_chemical_tracer_test|SWCT]] test field group as a part of the field test program. A typical single-well pilot evaluation of an IOR process requires four to six weeks to complete.
<math>\nabla\psi\operatorname{d}\!y/\operatorname{d}\!x{\partial^2\over\partial x_1\partial x_2}y\nmid\sqrt[\biguplus\approx]{2}</math>


==Case study==
==Case study==
Automoderated users, Bureaucrats, checkuser, contributors, createpage, diff, display-new-unapproved-content, displaysubtitle, edit, editsandbox, history, industry, Interface administrators, member, memberonlyaccess, minoredit, Moderators, override, reupload, reupload-own, Staff, Administrators, upload, Upload Wizard campaign editors, viewlinktolatest, watch, widgeteditor, wysiwyg
7,247

edits