AFE: tubulars: Difference between revisions

no edit summary
mNo edit summary
No edit summary
 
Line 1: Line 1:
Casing and tubing costs are significant factors in the well cost that must be properly estimated in the [[Authority for expenditures (AFE)|authority for expenditure]] (AFE). In some cases, they may account for 50 to 60% of the total expenditures. The costs are dependent on well depth, size, grade requirements, and couplings. <math>{\partial^2\over\partial x_1\partial x_2}y</math>
Casing and tubing costs are significant factors in the well cost that must be properly estimated in the [[Authority for expenditures (AFE)|authority for expenditure]] (AFE). In some cases, they may account for 50 to 60% of the total expenditures. The costs are dependent on well depth, size, grade requirements, and couplings.


==Pipe costs==
==Pipe costs==
Automoderated users, Bureaucrats, checkuser, contributors, createpage, diff, display-new-unapproved-content, displaysubtitle, edit, editsandbox, history, industry, Interface administrators, member, memberonlyaccess, minoredit, Moderators, override, reupload, reupload-own, Staff, Administrators, upload, Upload Wizard campaign editors, viewlinktolatest, watch, widgeteditor, wysiwyg
7,247

edits