You must log in to edit PetroWiki. Help with editing

Content of PetroWiki is intended for personal use only and to supplement, not replace, engineering judgment. SPE disclaims any and all liability for your use of such content. More information


Changes

Jump to navigation Jump to search
no edit summary
In every case, the process was evaluated successfully using the [[Single_well_chemical_tracer_test|SWCT]] test. In most of these sequences, the IOR fluid injection and push steps were carried out by the [[Single_well_chemical_tracer_test|SWCT]] test field group as a part of the field test program. A typical single-well pilot evaluation of an IOR process requires four to six weeks to complete.
 
{{NumBlk|2=2-2=0|3=1}}
==Case study==
Automoderated users, contributors, createpage, diff, display-new-unapproved-content, displaysubtitle, edit, editsandbox, history, member, memberonlyaccess, minoredit, Moderators, override, reupload, reupload-own, Staff, Administrators, upload, Upload Wizard campaign editors, viewlinktolatest, watch, widgeteditor, wysiwyg
7,217

edits

Navigation menu